ebm-papst A4D710-AL01-02 Operating Instructions Manual Download Page 4

Operating instructions

A4D710-AL01-02

Translation of the original operating instructions

3. TECHNICAL DATA

3.1 Product drawing

All measures have the unit mm.

1

Direction of air flow "A"

2

Screw depth max. 18 mm

3

Tightening torque 1.5 Nm±0.2 Nm

4

Cable diameter min. 7 mm, max. 14 mm, tightening torque 2 Nm ±0.3 Nm

Item no. 10036-5-9970 · Revision 75725 · Release 2012-02-28 · Page 4 / 10

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Summary of Contents for A4D710-AL01-02

Page 1: ...rised specialist personnel are permitted to transport unpack assemble operate or maintain the device or to use it in any other manner 1 3 Basic safety rules 1 1 3 Basic safety rules Any safety hazards...

Page 2: ...oose items of clothing and jewellery could become entangled and pulled into the device You could be injured Do not wear any loose clothing or jewellery while working on rotating parts Protect long hai...

Page 3: ...imbalance e g caused by dirt deposits or icing Operation in medical equipment with a life sustaining or lifesaving function Operation with external vibrations Moving solids content in flow medium Pai...

Page 4: ...1 Direction of air flow A 2 Screw depth max 18 mm 3 Tightening torque 1 5 Nm 0 2 Nm 4 Cable diameter min 7 mm max 14 mm tightening torque 2 Nm 0 3 Nm Item no 10036 5 9970 Revision 75725 Release 2012 0...

Page 5: ...A Direction of rotation Counter clockwise seen on rotor Type of protection IP 54 Insulation class F Humidity class F3 1 Mounting position Any Condensate discharge holes On rotor and stator sides Opera...

Page 6: ...n the customers side and can damage the device Make sure that the cable end is connected in a dry environment Connect the device only to circuits that can be switched off using an all pole disconnecti...

Page 7: ...nstalled lying flat cable routed as a water trap Fans installed in upright position When routing the cable ensure that the screwed cable glands are arranged at the bottom The cables must always be rou...

Page 8: ...ction Y Star connection L1 V1 blue L2 U1 black L3 W1 brown W2 yellow U2 green V2 white TOP 2 x grey PE green yellow Item no 10036 5 9970 Revision 75725 Release 2012 02 28 Page 8 10 ebm papst Mulfingen...

Page 9: ...repairs may be carried out by ebm papst only The terminal box does not have to be opened for maintenance Do not perform any repairs on your device Return the device to ebm papst for repair or replacem...

Page 10: ...pection At least every 6 months Replacement of the device Mounting the connection lines Visual inspection At least every 6 months Fasten Mounting of protective earth connection Visual inspection At le...

Reviews: