Operating instructions

A2E200-AF02-54

Translation of the original operating instructions

3. TECHNICAL DATA

3.1 Product drawing

All dimensions in mm.

1

Airflow direction "V"

2

Max. clearance for screw 5 mm

3

Cable PVC AWG20
4x splice

Item no. 16978-5-9970 · ENU · Change 210794 · Approved 2020-03-02 · Page 4 / 11

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Summary of Contents for A2E200-AF02-54

Page 1: ...and otherwise used by suitably qualified trained and authorized technical staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the elect...

Page 2: ...efore working on the system machine wait until all parts have come to a standstill WARNING Rotating device Long hair and dangling items of clothing jewelry and the like can become entangled and be pul...

Page 3: ...ing the device in an unbalanced state e g due to dirt deposits or ice formation Resonant operation operation with severe vibration This also includes vibration transmitted to the fan from the customer...

Page 4: ...rawing All dimensions in mm 1 Airflow direction V 2 Max clearance for screw 5 mm 3 Cable PVC AWG20 4x splice Item no 16978 5 9970 ENU Change 210794 Approved 2020 03 02 Page 4 11 ebm papst Mulfingen Gm...

Page 5: ...not provided with overheating protection at the factory CE Approval UL 507 With regard to cyclic speed loads note that the rotating parts of the device are designed for a maximum of one million load c...

Page 6: ...ether the information on the nameplate matches the connection data If the motor run capacitor was not installed by ebm papst check whether the information on the motor run capacitor matches the inform...

Page 7: ...cable should be routed in a U shaped loop wherever possible If this is not possible a drip edge can be produced by fitting a cable tie directly in front of the cable gland for example Fans installed u...

Page 8: ...ctions 4 4 Connection diagram U1 blue Z brown U2 black PE green yellow Item no 16978 5 9970 ENU Change 210794 Approved 2020 03 02 Page 8 11 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D 74673 Mulfingen...

Page 9: ...sconnect the ground connection last 5 MAINTENANCE MALFUNCTIONS POSSIBLE CAUSES AND REMEDIES Do not perform any repairs on your device Send the device to ebm papst for repair or replacement WARNING Liv...

Page 10: ...ation of cables for damage Visual inspection At least every 6 months Replace cables Condensation drainage holes for clogging where necessary Visual inspection At least every 6 months Open holes Welds...

Page 11: ...The materials concerned are as follows Miscellaneous insulators used in the terminal box Power cables Cables for internal wiring Electrolytic capacitors Dispose of electronic components employing the...