
Operating instructions
8300100053
VBH0310CTPMS
Translation of the original operating instructions
3. TECHNICAL DATA
3.1 Product drawing
All dimensions in mm.
1
Installed position: shaft horizontal (install support struts only vertically as illustrated) or rotor on bottom; rotor on top on request
2
Cable PVC AWG18
6x wire-end ferrule
3
Cable PVC AWG22
5x wire-end ferrule
4
Inlet ring with pressure tap (k-factor: 115)
5
Fastening holes for FlowGrid 25310-2-2957 (not included in scope of delivery) are provided and must be subsequently opened as required
Item no. 1170000711 · ENU · Change 230626 · Approved 2022-10-28 · Page 4 / 13
ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com