13
5. Fastening of heating cable must be done with c/c 20 cm.
Cable Clip 5
c/c
2
c/c
2
EN
6. Perform other insulation and resistance measurements
and fill in the test report or Garantera on your smartphone.
Document the location of the cable with a photo.
8. If possible, after applying screed, alternatively after floor-
ing has been laid, perform a third insulation and resistance
measurement of the heating cable. Fill in the test report or
use Garantera on your smartphone.
For tiles, wait 4 weeks after installation before turning on the heat.
M
Ω
/
Ω
7. Cover the floor with a suitable floor filler. Keep in mind that
the cable must be under the sealing layer in wet rooms.