EBARA DVSHU Operating Instructions, Installation & Maintenance Manual Download Page 3

EBARA Submersible Semi-vortex Sewage Pumps

DVSU/DVSHU

Operating, Installation, and Maintenance

Installation

1. Check the following before beginning installation:

Insulation resistance measurement:
(1) For three phase motor:

With the motor and cable (excluding the power supply connections) immersed in water, use a meggar to measure the 
insulation resistance between the ground wire and each phase of the motor.

(2) For single phase motor:

Use a megger to measure the insulation resistance betweeb each wire and grounding wire.

Pump Checks

1. Check the following points upon receipt of

your pump:

(1) Check the name plate to confirm that it is the pump 

ordered.

(2) Ensure that the pump voltage is the same as the power 

at your location.

(3) Check oil level at oil plug.
(4) Check that all plugs and fastening bolts are properly 

tightened.

(5) Check that the pump has not been damaged and the 

cable glands and cables are in a satisfactory condition.

(6) Check accessories and spare parts against the packing 

list.

(7) Check that the impeller turns smoothly by hand.

2. Precautions when operation is suspended:

(1) If operation is to be suspended for 30 days with the pump 

immersed in water, measure the insulation resistance of the 
motor.
If resistance is over 1 mega ohm, operate pump to prevent 
rust from developing on moving parts. Follow the instructions 
under OPERATION when pump operation is to be resumed.

(2) For dry storage, clean out pump and store in a  dry place.

Follow the instructions under INSTALLATION and OPERATION
when pump operation is to be resumed.

WARNING

Before insulation resistance measurement, always disconnect the power first.

All electrical work should be performed by a qualified electrician and all national and local electrical codes must
be observed.

CAUTION

When measuring the insulation resistance with meggar for motor windings do not test overload protection.

Overload protection is MOTOR PROTECTION (AUTO-CUT) that is used for up to 5HP; the motor still could have power to
it if AUTO-CUT is kicked out.

CAUTION

Measure the insulation resistance. The value should be more than 1 mega ohm. While making the measurement, keep the
power supply cable off the ground.

CALL 1-800-577-8111 FOR SALES AND SUPPORT

Summary of Contents for DVSHU

Page 1: ...ersible Semi Vortex Sewage Pump Model DVSU Model DVSHU Operating Instructions Installation Maintenance Manual EBARA Fluid Handling EBARA International Corporation CALL 1 800 577 8111 FOR SALES AND SUP...

Page 2: ...septic gaseous or possible septic sump Do not work under heavy suspended objects unless there is a positive support under it to stop its fall in event of sling or hoist failure Disregard of this warni...

Page 3: ...t the impeller turns smoothly by hand 2 Precautions when operation is suspended 1 If operation is to be suspended for 30 days with the pump immersed in water measure the insulation resistance of the m...

Page 4: ...wn 8 Non automatic pumps model DVSU DVSHU do not have an automatic operating system based on built in floats Do not operate the pump for a long time with the water level near the minimum operating lev...

Page 5: ...ctrical work should be performed by a qualified electrician and all national and local electrical codes must be observed Three Phase Model DVSU E GREEN U RED V WHITE W BLACK PR PROTECTOR AUTO CUT L1 R...

Page 6: ...e activated Constant repetition of this action will shorten pump service life Do not start the pump again in such a situation until after the motor has completely cooled 2 Test Operation 1 Model DVSU...

Page 7: ...e mechanical seal can be prolonged by replacing the oil in the mechanical seal chamber once a year When replacing the oil lay the pump on its side with filler plug on top as shown in Fig 5 For model D...

Page 8: ...scharge piping 7 Inspect repair 8 Clogging of discharge piping 8 Remove foreign matter 9 Foreign Matter in suction inlet 9 Remove foreign matter 10 Foreign matter clogging pump 10 Disassemble and remo...

Page 9: ...0 A48 Class 30 AISI420 A283 Grade D AISI304 AISI304 AISI304 AISI304 NO FOR 1 UNIT 1 1 1 1 1 1 1 1 1 1 1 1 2 3 or 4 4 3 or 4 PART NO 174 193 219 801 802 811 814 816 830 842 848 849 1 849 2 865 915 PART...

Page 10: ...30 AISI420 A283 Grade D AISI304 AISI304 AISI304 AISI304 AISI304 NO FOR 1 UNIT 1 1 1 1 1 1 1 1 2 1 1 1 4 4 4 4 1 PART NO 135 174 193 200 801 802 811 814 816 817 830 842 848 849 1 849 2 915 PART NAME WA...

Page 11: ...Purchaser No allowance will be made for repairs without EIC s written consent or approval and the Warranty Period shall not be suspended upon stopping operation for warranty repairs nor recommence up...

Page 12: ...Contact your dealer or supplier for more information about other EBARA products CALL 1 800 577 8111 FOR SALES AND SUPPORT...

Reviews: