Eaton Wright-Line TechOrganizer Corner Manual Download Page 1

1

The 

Corner TechOrganizer 

can be installed on Linx

Worksurfaces or appropriate industrial work benches.

LINX Worksurfaces with full depth uprights are 
recommended to provide a Workstation/Organizer
with greatest stability.

Important Safety Instructions

* The Organizer must be properly secured to the Work-
   surface prior to installing of components.

* Frame load capacity is 300 lbs. (Linx worksurfaces)
   400 lbs. (Workbenches).

* Do not install shelves that are greater than 18” deep.

* Do not install shelves more than 35” above the Work-
   surface.

1. Assemble Left hand and Right hand 

Organizer frames

    to the 

Corner post 

with the 1/4”-20 x 1-5/8” Button

    head cap screws provided. See 

Figure 1

.

Corner TechOrganizer

Figure 1

R.H. Organizer 
frame

L.H. Organizer 
frame

Corner post

1/4”-20 x 1-5/8” Button
head cap screws

Tools Required

     -#33 (.113 dia.) Drill (Jobbers length)                                              
     -Electric drill
     -5/32” Allen wrench (provided)
     -Phillips head screwdriver
     -Plastic mallet

85081

Rev A    11/20/07

C o r n e r  
T e c h O r g a n i z e r

Summary of Contents for Wright-Line TechOrganizer Corner

Page 1: ...rfaces 400 lbs Workbenches Do not install shelves that are greater than 18 deep Do not install shelves more than 35 above the Work surface 1 Assemble Left hand and Right hand Organizer frames to the Corner post with the 1 4 20 x 1 5 8 Button head cap screws provided See Figure 1 Corner TechOrganizer Figure 1 R H Organizer frame L H Organizer frame Corner post 1 4 20 x 1 5 8 Button head cap screws ...

Page 2: ... Worksurface See Figure 2 NOTE If the feet are not 90 to the frame tap the ends with a plastic mallet to correct 4 Attach the frame bottom crossbar to the worksurface using the 10AB x 2 25 Phillips head flat head screws provided See Figure 2 5 Attach the feet to the Worksurface using the four 10AB x 75 Phillips pan head screws provided See Figure 2 20 Linx worksurface with full depth uprights Corn...

Page 3: ...that are greater than 18 deep Do not install shelves more than 35 above the Work surface 1 Position the Corner TechOrganizer in the desired location on the back of the Phenolic worksurface See figure 1 2 Using the holes in the frame bottom crossbars as a template locate and drill the appropriate quantity of 164 dia holes 650 deep in the worksurface See figure 1 NOTE If the feet are not 90 to the f...

Page 4: ...ate locate and drill four 218 dia holes thru the worksurface Attach the feet to the worksurface using the four 10 x 1 25 phillips pan head machine screws 10 washers 10 32 lock nuts and 10 32 acorn nuts provided See figure 2 Figure 2 TechOrganizer 10 x 1 25 phillips pan head machine screws 10 32 lock nuts 10 32 acorn nuts 10 washers Foot 85081 ...

Reviews: