16
Component Installation
Wiring Harness
Installation
Wiring Harness Installation
Installation of the wiring harness should start from the CPU and then extend outward to the other components.
Avoid routing the wiring harness near sharp edges or extreme heat, which could damage wire insulation.
Route the wires along existing wires, up through existing pass-through holes or spaces in the floor or dashboard to the
installed components. Coil up the slack in the wire harness and store it neatly behind the dashboard or kick panels,
depending upon the location of the CPU. The following illustration shows a typical installation of the wiring harness.
Note: Use the protective loom where necessary. Tie-wrap the harness for a secure/neat installation.
1 - Driver display unit
2 - Side sensor display
3 - To side sensor and antenna assembly
4 - Central Processing Unit
5 - Ground strap
CAUTION
2
1
3
4
5
Summary of Contents for VORAD AlwaysAlert
Page 29: ......