background image

1. CAUTION

When MV equipment is operating, certain components 
are live, other parts may be in movement and some 
may reach high temperatures.
Therefore, the use of this equipment poses electrical, 
mechanical and thermal risks.

Consequently, the equipment to which the present 
manual refers complies with the requirements 
of section 11.2 of Standard IEC 62271-1. It must 
therefore only be operated by appropriately qualified 
and supervised personnel, in accordance with the 
requirements of standard EN 50110-1 on the safety 
of electrical installations and standard EN 50110-2 
on activities in or near electrical installations.

Personnel must be fully familiar with the instructions 
and warnings contained in this manual and in other 
recommendations of a more general nature which 
are applicable to the situation according to current 
legislation. 

The above must be carefully observed, as the 
correct and safe operation of this equipment 
depends not only on its design but also on general 
circumstances which are in general beyond the 
control and responsibility of the manufacturer. 
More specifically:

The manufacturer guarantees this product against 
any defect in materials and operation during the 
contractual period. In the event that defects are 
detected, the manufacturer may opt either to repair 
or replace the equipment. Improper handling of this 
equipment and its repair by the user shall constitute a 
violation of the guarantee.

The equipment must be handled and transported 
appropriately from the factory to the place of 

 

installation.

All intermediate storage should occur in conditions 
which do not alter or damage the characteristics of the 
equipment or its essential components.

Service conditions must be compatible with the equipment 
rating.

The equipment must be operated strictly in accordance 
with the instructions given in the manual, and the 
applicable operating and safety principles must be 
clearly understood.

Maintenance should be performed properly, taking 
into account the actual service and environmental 
conditions in the place of installation. 

The manufacturer declines all liability for any significant 
indirect damages resulting from violation of the 
guarantee, under any jurisdiction, including loss of 
income, stoppages and costs resulting from repair or 
replacement of parts.

Warranty

Mortal danger due to high voltage. Before performing 
assembly or maintenance work, the system must be 
isolated from high voltage, and earthed.

Mortal danger due to supply voltage. Before performing 
assembly or maintenance work, the system must be 
isolated from the supply voltage.

Risk of injury from movable parts in mechanical drives. 
Before performing maintenance work,

After the removal of covers from a switchgear, 
operator safety regarding internal arcs may be reduced 
unless the switchgear is isolated from the power 
supply. Optimum operator safety is only ensured if 
the switchgear is completely isolated from the power 
supply and earthed for assembly work.

Isolate the system from the supply voltage

Release the circuit-breaker’s energy storing device by 
OFF- ON - OFF operation and in case of a make-proof 
earthing switch, by the appropriate ON- operation.

Danger!

Danger!

Warning!

Warning!

Before performing work on the panels, it is essential that 

you comply with the following instructions:

6

Ulusoy URING12-24 - LLF - SF  Insulated Compact RMU Switchgear with Fuse User Manual

 

May 2020 www.eaton.com 

1

Summary of Contents for Ulusoy URING12-24 F - SF6

Page 1: ...Ulusoy URING12 24 LLF SF Insulated Compact RMU Switchgear with Fuse User Manual 12 24kV 200 630A 21kA 3s 6 www eaton com...

Page 2: ...G 6 PHASE CONFORMITY TEST 6 CABLE TEST 6 8 1 1 Closing the Switchgear Door 7 8 1 2 Opening the Earthing Switch 8 8 1 3ChargingSpring 8 8 1 4 Closing the LBS 9 8 2 CUTTING ENERGY 9 8 2 1 Opening the LB...

Page 3: ...ot alter or damage the characteristics of the equipment or its essential components Service conditions must be compatible with the equipment rating The equipment must be operated strictly in accordanc...

Page 4: ...or on a pallet depending on the type of handling involved To handle assemblies of up to 5 functional units one of the following methods must be used Using a forklift truck or pallet jack Lifting using...

Page 5: ...C The switchgear must be protected from direct solar radiation Maximum altitude is 2000 m The environmental air must not have any significant contamination from dust smoke corrosive and or inflammabl...

Page 6: ...3 way design URING12 24 RMU can be designed up to 5 way unit as extensible or non extensible system Switching device in URING12 24 is three positioning close openearthed LBS It has high number of swi...

Page 7: ...ting Handle Remote Controller Button optional 125 236 110 110 110 110 110 110 287 372 6 DIMENSIONS 861 1240 1642 Ulusoy URING12 24 LLF SF Insulated Compact RMU Switchgear with Fuse User Manual May 202...

Page 8: ...able faults Turn the breaker ON Turn the disconnector ON Turn the earthing disconnector OFF Open the switchgear front cover Place the cable test device Turn the earthing disconnector ON Perform the re...

Page 9: ...r Door Put the bottom side of the door to the switchgear Pull the door down Push the door towards the switchgear The door is now closed Ulusoy URING12 24 LLF SF Insulated Compact RMU Switchgear with F...

Page 10: ...8 1 3 Charging Spring Insert the handle to the spring charging hole Turn it anti clock wise to charge the spring and remove the handle Find manual motor selection button Turn it from manual to motor...

Page 11: ...ess Opening O button to close Check the position indicator for close position Check the position indicator for open position Put the lever into the earthing switch lever hole Rotate the lever in the d...

Page 12: ...k the position of the earthing switch It must be in close position now 8 2 3 Opening the Switchgear Door Pull the door down Push the door upwards 10 Ulusoy URING12 24 LLF SF Insulated Compact RMU Swit...

Page 13: ...6 Remove the blown fuse 2 Insert the handle and turn it anti clock wise 9 MV FUSE REPLACEMENT 7 Replace the new fuse make sure that striker pin looks upwards 8 Tighten the contact screw by screwdriver...

Page 14: ...lock wise and make sure push on installation Elbow connector interface A for transformer protection connection T connector interface C for incoming outcoming connection 10 CABLE CONNECTION 12 Ulusoy U...

Page 15: ...EAR Modular Switchgear are combined by using 6 pieces of M8x30 bolt Prior to assembly silicon crossing bushings and contact holes must be cleaned well Ulusoy URING12 24 LLF SF Insulated Compact RMU Sw...

Page 16: ...n is to improve the quality of life and the environment through the use of power management technologies and services We provide sustainable solutions that help our customers effectively manage electr...

Reviews: