![Eaton Transformer 5000 Quick Start Download Page 3](http://html1.mh-extra.com/html/eaton/transformer-5000/transformer-5000_quick-start_4123661003.webp)
STEP 3: Transformer 5000 Rack Configuration
LOAD 4 / 1
20V~,16A
LOAD 1
120V~,16A
LOAD 2
120V~,16A
SET THIS
SWITCH WHEN
UNPOWERED
BY ALL SOURCE
S
INPUT VOLTAGE
SELECTION
240~
208~
INPUT
BREAKER
TRANSFO
RMER
PROTECT
ION
LOAD 3 / 1
20V~,16A
LOAD 3
BREAKER
LOAD 1
BREAKER
LOAD 2
BREAKER
LOAD 4
BREAKER
LOAD 4 / 1
20V~,16A
LOAD 1
120V~,16A
LOAD 2
120V~,16A
SET THIS
SWITCH WHEN
UNPOWERED
BY ALL SOURCE
S
INPUT VOLTAGE
SELECTION
240~
208~
INPUT
BREAKER
TRANSFO
RMER
PROTECT
ION
LOAD 3 / 1
20V~,16A
LOAD 3
BREAKER
LOAD 1
BREAKER
LOAD 2
BREAKER
LOAD 4
BREAKER
LOAD
4 / 12
0V~,1
6A
LOAD
1
120V
~,16A
LOAD
2
120V
~,16A
SET THI
S
SWITCH
WHEN
UNPOW
ERED
BY ALL
SOURC
ES
INPUT V
OLTAGE
SELECT
ION
240~
208~
INPU
T
BREA
KER
TRAN
SFOR
MER
PROT
ECTIO
N
LOAD
3 / 12
0V~,1
6A
LOAD
3
BREA
KER
LOAD
1
BREA
KER
LOAD
2
BREA
KER
LOAD
1
120V
~,16A
LOAD
2
120V
~,16A
SET THI
S
SWITCH
WHEN
UNPOW
ERED
BY ALL
SOURC
ES
INPUT V
OLTAGE
SELECT
ION
240~
208~
INPU
T
BREA
KER
TRAN
SFOR
MER
PROT
ECTIO
N
LOAD
1
BREA
KER
LOAD
2
BREA
KER
3
4
4
4
4
2
2
1
4
4
5
1
6
6
6
6
STEP 4:
Transformer, UPS, and MX EXB RT Systems Connections
Transformer
5000
Input
Cable
L6-30P
MX EXB
Battery
MX EXB
Battery
MX 5000 RT
UPS
Transformer
5000
15
1
17
19
See System Installation and User Manual for details and initial start-up procedures.
86-87102-00 A01 - Page 2
Quick Start
1. Attach both front mounting ear brackets to
Transformer 5000 module with supplied
screws (for this step, it is possible to adjust
the position of both front mounting brackets).
2. Attach rear support brackets to module.
These brackets prevent the Transformer 5000
module from sliding out of the rack.
3. Attach rails together and secure with wing
nuts, and finger tighten both sides.
4. Attach both rails to rear and front of rack with
supplied flathead screws (as shown).
The UPS may remain connected
to AC source while installing the
transformer.
1. Connect the transformer input
cable L6-30P
(17)
to one of the
UPS outlets L6-30R
(1)
.
2. Connect the 120V load to the
outlet of transformer
(15)
or
(19)
.
Note:
If an “RCD” load is connected
to the transformer, the UPS may go
into bypass mode, sound an alarm,
and perform self diagnostics for 23
seconds before returning to normal
operation.
5. Use caution when sliding unit
into rack. Temporarily secure
unit to rack with thumb screws
on front mounting brackets.
6. Secure rear support brackets to
rails.