33
Eaton RF-System
© 2015 Eaton Electrical Group
devices notice how good or bad they understand every message. Depending on the number of
devices and their software version 18 or 48 test messages are sent every cycle.
3. From every main supplied device the reception table is scanned. Depending on number and
data in the devices this lasts different. Point 2 and 3 are repeated as often as the reception quality
of every device is known exactly. In the end you have to activate battery supplied devices (so they
can also send test messages). What device should be scanned or which you should activate you
see in the list in the scan window.
The sequence ends automatically after the reception qualities of every device is known.
These function is only available in the professional version.
Recalculate all Connections
In case you have modified the built-in position of the devices in an existing system, this is where
you have the possibility to recalculate all the connections after a
, including the
routing paths.
The calculation is based on the reception quality identified while scanning.
With each new connection you define in the
, the relevant Connection will
automatically be recalculated.
In case you only wish to recalculate part of the paths, you can right-click the required connection
and have this connection recalculated.
Load
By using this command actual changes that has been made to the project can be loaded into the
devices.
Either when clicking on the symbol
or the menu item (Actions -> Load)
When loading the main supplied devices are loaded first and afterwards all battery supplied
devices have to be activated.
The sequence of the loading process is not important. By using the buttons “to battery supplied
devices” and “back to main supplied devices” you can switch while moving through the project.
A simple list shows what devices has to be loaded.
Summary of Contents for RF System 2.42
Page 1: ...Eaton RF System 2 42 Manual...
Page 123: ...123 Eaton RF System 2015 Eaton Electrical Group State Syntax of RM to user...
Page 193: ...193 Eaton RF System 2015 Eaton Electrical Group...
Page 200: ...200 Eaton RF System Help 2015 Eaton Electrical Group 7 And assign the function Blinking to it...
Page 223: ...223 Eaton RF System 2015 Eaton Electrical Group Group settings analogue actuator...
Page 224: ...224 Eaton RF System Help 2015 Eaton Electrical Group Group settings heating actuator...
Page 225: ...225 Eaton RF System 2015 Eaton Electrical Group Group settings binary input battery supplied...
Page 227: ...227 Eaton RF System 2015 Eaton Electrical Group Group settings Temperature input...