Power Xpert 9395P-600 (380V-600V) UPS Installation and Operation Manual
S
P-164000710 Rev 1
www.eaton.com/powerquality
4-1
Chapter 4
UPS System Installation
4.1
Preliminary Installation Information
W
A
R
N
I
N
G
Installation should be performed only by qualified personnel.
A
V
E
R
T
I
S
S
E
M
E
N
T
!
L’installation ne doit être effectuée que par du personnel qualifié.
Refer to the following while installing the UPS system:
S
Chapter 3 for cabinet dimensions, equipment weight, wiring and terminal data, and
installation notes.
S
Do not tilt the cabinets more than
"
10
°
during installation.
S
Remove the conduit landing plates to add conduit landing holes as required. Plate
material is 16 gauge steel (1.5 mm/0.06
”
thick).
S
If perforated floor tiles are required for ventilation, place them in front of the UPS.
4.2
Unloading the UPS Sections from the Pallet
The ISBM cabinet section is bolted to a wooden pallet supported by wood skids. The
UPM cabinet section is also bolted to a wooden pallet supported by wood skids. The
optional field-install UPM (FI-UPM) section is delivered bolted to a wooden pallet
supported by wood skids as well. Once unloaded, these sections are mechanically
and electrically joined. Together, they are referred to as the UPS.
W
A
R
N
I
N
G
The ISBM with UPM or UPMs section is heavy (see Table 3‐1). If unpacking and unloading instructions are
not closely followed, the cabinets may tip and cause serious injury.
A
V
E
R
T
I
S
S
E
M
E
N
T
!
Les sections de l’onduleur sont lourdes (voir le tableau 3-1). Suivre attentivement les instructions de
déchargement et de déballage pour éviter de renverser les armoires, ce qui pourrait causer de graves
blessures.
Figure