![Eaton PowerXpert 9395P-600/200 Installation And Operation Manual Download Page 66](http://html1.mh-extra.com/html/eaton/powerxpert-9395p-600-200/powerxpert-9395p-600-200_installation-and-operation-manual_527289066.webp)
UPS INSTALLATION PLAN AND UNPACKING
Eaton
Power Xpert 9395P-600 (380V-600V) UPS Installation and Operation Manual
S
P-164000710 Rev 1
www.eaton.com/powerquality
3-34
Conduit sizes were chosen from NEC Table 4, Electrical Metallic Tubing (EMT). See
Table 3‐22 through Table 3‐27 for 600V, 575V 480V, 415V, 400V and 380V conduit
requirements.
Per NEC article 300, 3(B)(1), all three‐phase conductors must be run in the same
conduit.
Conduit is sized to accommodate one neutral conductor the same size as the phase
conductor and one ground conductor sized in accordance with NEC Table 250.122.
Conduit sizes listed are for copper wiring only.
Table 3‐22. 600V Power Cable Conduit Recommendations
UPS Model
Voltage
Terminal
Number of Wires
in Conduit
Minimum Conduit
Trade Size (in.)
Number of
Conduits
Eaton 9395P-600/550
600 Vac
AC Input to UPS Rectifier
(A, B, C, Ground)
4
3
4
AC Input to Bypass and Output
(A, B, C, Ground)
4
3
3
Eaton 9395P-600/500
600 Vac
AC Input to UPS Rectifier
(A, B, C, Ground)
4
3
4
AC Input to Bypass and Output
(A, B, C, Ground)
4
3
3
Eaton 9395P-600/450
600 Vac
AC Input to UPS Rectifier
(A, B, C, Ground)
4
3
3
AC Input to Bypass and Output
(A, B, C, Ground)
4
3
3
Eaton 9395P-600/400
600 Vac
AC Input to UPS Rectifier
(A, B, C, Ground)
4
3
3
AC Input to Bypass and Output
(A, B, C, Ground)
4
3
3
Eaton 9395P-600/300
600 Vac
AC Input to UPS Rectifier
(A, B, C, Ground)
4
3
2
AC Input to Bypass and Output
(A, B, C, Ground)
4
3
2
DC (same for all ratings)
Battery
(Positive, Negative, Ground)
See Note 1
NOTE 1
Select conduit taking into consideration the DC input wire sizes and terminations listed in appropriate Tables, type of battery installation, and
requirements from NEC Table 4, Electrical Metallic Tubing (EMT).
NOTE 2
Bypass conduit data is not applicable to IOM configurations.
Battery Cable Routing:
Refer to the notes at the bottom of Table 3‐6 Input/Output Ratings and External Wiring Requirements.