3
Instruction Leaflet
PUB53765
Effective November 2021
DM1/DM1 Pro plenum rated NEMA 1 kit
EATON
www.eaton.com
Installation steps for DM1/DM1 Pro FR1
plenum rated NEMA 1 kit
Step 1
Record the catalog number, style number, and serial number on
the part number label
a
from the rating label attached on the right
surface of the drive plastic housing, then attach the part number
label to the NEMA 1 kit front cover
b
(see Figure 1) . DO NOT cover
the venting holes on the front cover .
Remove the two screws
c
and disassemble the NEMA 1 kit front
cover
b
(see Figure 1) .
Table 2. FR1 installation screw types by call-outs.
c
e
f
g
t
21
FR1
M3 x 8 M3 x 8 M3 x 8 M3 x 8 M3 x 15 M3 x 8
Figure 1. Completing the product information on the part
number label.
Step 2
Remove the two screws
e
and disassemble the conduit box (see
Figure 2) .
Remove the two screws
f
and disassemble the NEMA 1 kit fan
cover
j
(see Figure 2) .
Remove the two screws
t
and disassemble the EMC grounding
clamp
q
(Figure 2)
Remove the two screws
g
and disassemble the NEMA 1 kit left
plate
h
and NEMA 1 kit right plate
i
(see Figure 2) .
Figure 2. Removing the NEMA 1 front cover, conduit box, fan
cover, and left & right plate.
Step 3
Remove the terminal cover
④
(see Figure 3) .
Insert the drive into the metal NEMA 1 kit drive housing
⑪
(see
Figure 4) .
Figure 3. Removing the terminal cover.
Figure 4. Inserting the drive into the metal NEMA 1 drive
housing.
NEMA 1 kit
front cover
②
Part number
label
①
Screws
③
NEMA1 kit left plate
⑧
Screws
⑦
NEMA1 kit
right plate
⑨
Screws
⑥
⑩
NEMA1 kit
conduit plate
⑭
Screws
⑤
Screws
⑳
EMC grounding clamp
⑰
NEMA1 kit fan cover
Terminal cover
④
NEMA 1 kit drive housing
⑪
Mounting
Montage
Montage
Montaje
Montaggio
安
安装
装
Монтаж
Montering
Montering
Τοποθέτηση
Montagem
Montering
Asennus
Montá
Paigaldamine
Felszerelése
Montāa
Montavimas
Montaż
Montaa
Montá
Монтаж
Montarea
Montaa
Montaj
Монтаж
ﺐ
ﺐــــــــــــﻴﻴﻛﻛﺮﺮﺘﺘﻟﻟاا
en
de
fr
es
it
zh
ru
nl
da
el
pt
sv
fi
cs
et
hu
lv
lt
pl
sl
sk
bg
ro
hr
tr
uk
ar