11. Remove the two ground straps from the rear panel of the EBC or Options Cabinet (installed at the top
corners).
12. Install one ground strap between the rear panels of the adjacent cabinets as shown in Figure 11.
13. Install the other ground strap between the front panels of the adjacent cabinets as shown in Figure 11.
14. Repeat Steps 11 through 13 for each cabinet.
15. Replace the front door of all cabinets.
16. Continue to “Electrical Installation” on page 21.
Edge Grommet for
Options Cabinet
S
P
U
t
e
n
i
b
a
C
s
n
o
i
t
p
O
C
B
E
Summary of Contents for Powerware 9355
Page 1: ...Eaton 9355 UPS 20 30 kVA Installation and Operation Manual...
Page 2: ......
Page 3: ...Eaton 9355 UPS 20 30 kVA Installation and Operation Manual...
Page 99: ......
Page 100: ...164201626 D 164201626 F...