background image

Installation

        Note

We strongly recommend that a qualified
electrical contractor install this unit.
Copper wire and clean the wire, coat the
wire with an anticorrosion grease, and
retighten the assembly.

Three methods to choose from:

ON CONCRETE PAD-PAD MOUNT
BASE

Utilize the Pad Mount mounting base, as
shown in drawing above, pad mount
bracket mounts to inside of lower
portion of pedestal.

1.

Remove (2) screws from lower
access cover and slide cover down

to release from top retaining

bracket.

2.

Remove lower pedestal cover by
removing (4) screws. Pull cover
away from post.

3.

Assemble pad mount base to inside
of lower portion of pedestal
utilizing (9) screws provided.

4.

Pad mount bracket is provided with
six 3/8" diameter holes for
mounting to concrete using
compression bolts or threaded rod
set in the concrete.

    DIRECT BURY - PEDESTAL 

 EXTENSION

Utilize the in ground pedestal extension,
as shown in drawing above, in ground
pedestal extension mounts to inside of
lower portion of pedestal.

1.

Remove (2) screws from lower
access cover and slide cover down

to release from top retaining

bracket.

2.

Remove lower pedestal cover by
removing (4) screws. Pull cover
away from post.

3.

Assemble direct burial pedestal
extension to inside of lower portion
of pedestal utilizing (9) screws

provided.

4.

Insure that post is positioned
properly. Bottom of post should be
24" below grade level.

5.

Lay wires in and attach to proper

terminals. Refer to publication on

panel cover for torque and wire size
information.

6.

Replace lower pedestal cover and
secure with (4) screws.

7.

Replace upper pedestal cover and
secure with (2) screws. To padlock
lower access cover utilize clip-on
hasp provided.

8.

To increase stability, mounting in
concrete at or below grade level

marking is recommended.

    POST MOUNT -4 X 4 INTERNAL

    POST

1.

Position pedestal in location of
install, mark center of pedestal
location.

2.

Dig hole to allow post to be below

frost line of area installed, typically
24" or deeper, consult local codes
to insure compliance.

3.

Install post and cement inplace,
back fill with soil.

4.

Once cementi set remove soil
below in forward facing area of
pedestal for incoming conductors
to be routed from wire trench.

5.

slide pedestal over post, post
should be no longer than 12" above
grade.

6.

Affix pedestal to post utilizing (4)

1/4-20 screws into post.

Parts

Save 10% When You Buy Parts and

Pedestals Online!

Please visit www.marinapower.com for
a full parts listing.

To request a parts handbook:

Call 1-800-723-8009
E-mail [email protected]

Eaton Corporation
Marina Power and Lighting
149 Warwick Court
Williamsburg, VA 23185
United States

tel: 1-800-723-8009
fax: 757-258-8805
www.marinapower.com

1

www.marinapower.com

1-800-723-8009

    Installation Guide #70-8760

    POWERSLIDE RV PEDESTAL

Powerslide RV Pedestal

Wiring Diagram

Reviews: