65
Instruction Booklet
IB022018EN
Effective July 2020
Instructions for the installation and
EATON
www.eaton.com
To see the two versions of a voltage transformer lift truck available,
.
To install a top voltage transformer,
•
Choose a lift truck configuration that applies to the ceiling height.
•
Temporarily install lift truck rails at the top of the target vertical
section. The rail assembly has end stops to prevent the lift truck
from rolling back off of the rails.
•
Mount the lift truck (low lift or high lift) on to the rails.
•
Low lift truck: use the lift truck winch to raise a VT in its bracket to
the VT compartment floor height.
•
High lift truck: use the lift truck winch to raise a VT in its bracket
above the vertical section top.
•
Move the lift truck and VT over the rails until they are above the
destination VT compartment.
•
Lower the VT into the VT compartment.
Figure 115. Fused bus VT mounting bracket brace.
•
Remove the VT port cover plate from the top of the XGIS tank.
shows the VT connection ports.
Figure 116. VT connection ports.
•
Remove the VT compartment front wall access bracket to
facilitate lowering the VT and bracket into place.
shows
the VT install access bracket being removed.
Figure 117. Remove VT install access bracket,
•
Apply silicone grease to the VT port inner cone on the top of the
XGIS tank.
Lower VT into installation position using the VT lift truck
•
Lift the VT using the lifting bracket eye and a lifting device rated
for over 1000 lbs (see
.
Figure 118. Lower VT bracket into place in VT compartment.
•
Lower the VT into place (see
.