Instructions for the installation and

commissioning of Power Xpert

 

IGX

medium-voltage switchgear

4.8.4.  Installing the main bus insulating sheath

Apply provided silicone grease evenly to the insulating surface of 

one end of the Main Bus insulating sheath immediately before 

installation to prevent contamination. Slide the main bus insulating 

sheath over the main bus link with greased side facing the bushing. 

Clean any silicone grease off the exposed end of the main bus link 

with the provided special cleaning wipes.

ote: 

N

Recommended amounts of silicone grease for various connections 

types can be found in 

Table 4

.

Table 4.  Silicone grease application guide

Part

Silicone grease amount

Main Bus Insulating Sleeve 

About 20g

Voltage transformer, lightning arrester and 

cable plug

About 10g

4.8.5.  Additional phases

Repeat 4.8.2, 4.8.3, and 4.8.4 for each phase.

4.8.6.  Install width setting members

Install two width setting members located at the top of the pole 

units using two bolts.

4.8.7.  Preparing the main bus insulating sheath for coupling

Apply provided silicone grease to gray area of the exposed end of 

each main bus insulating sheath.

4.8.8.  Coupling shipping splits

Draw shipping splits together ensuring that alignment pins in the 

frame are going into the holes on the opposite frame. As pins 

begin engaging, main bus links should be engaging with main bus 

bushings. 

ote: 

N

If bus links are not perpendicular to tanks, they can catch on internal 

edges of bushings and damage main bus bushings.

When the units are fully together, the width setting members will 

be contacting the corresponding mounting points. There will be 

approximately 6mm of clearance between the frames of the two 

vertical structures. Install remaining two bolts into width setting 

members and torque.

4.9.  Installing control, secondary and auxiliary wiring

Refer to the project schematic and wiring diagrams for information 

on wiring connections. Reconnect the wiring that was disconnected 

at the factory for shipping. The wiring as well as the connecting 

points are labeled. Check all wiring connections for tightness.  

4.10.  Bolting adjacent shipping groups

The inter-unit tie fasteners to join the shipping groups together must 

be installed and properly tightened. 
In general, installing Power Xpert IGX switchgear follows this 

sequence (refer to the customer drawings for switchgear lineup 

details):
1.  Secure a first vertical section or shipping group to the 

foundation

2.  Install main bus links in the first section or group phase tanks
3.  Position the next vertical section or shipping group next to the 

one just secured, tie bolt the adjacent sections together, and 

secure the added section or group to the foundation.

4.  Install main bus links in the next section or group exposed 

phase tanks

5.  Repeat steps 3 and 4 as needed

Attachment hardware

Use the following through-hardware to attach Power Xpert IGX 

shipping groups or vertical sections together. Each attachment will 

consist of

• 

M8-1.25 x 30lg Socket Head Cap Screw

• 

M8 wide flat washer (under head of screw)

• 

M8 wide flat washer (on nut side)

• 

M8 split lock washer (on nut side)

• 

M8 hex nut

4.10.1.  Attachment hardware bolt tightening torque

Use standard screws with a metric class 8.8 (ISO grade 5) or higher. 

Recommended tightening torque for this hardware is 

26 Nm (19.2 

ft-lb)

, with no lubricant required.

See 

Figure 27

 for guidance on attaching shipping groups or vertical 

sections. 53

 

bolt, washer, lock washer and nut combinations are 

required for attachment.

4.11.  Assembly checklist

The following installation and attachment instructions are set up in a 

checklist format to facilitate the process.

 

F

Locate the first vertical section or shipping group on its 

foundation

ote: 

N

Vertical sections intended as end vertical sections will be shipped with 

end sheets mounted on their intended outside walls. Refer to the 

project drawings for lineup details.

Position the vertical section on the cable vault foundation according 

to the project lineup arrangement drawings. See section 

4.7. 

Anchoring shipping groups to the foundation

. Refer to 

Figure 10 

for details on vault rail flatness and level.

 

F

Anchor the vertical section to its foundation

See 

Figure 10 

and the project drawings for the details of attaching 

Power Xpert IGX vertical sections to the system foundation. Use the 

hardware and torque specified.

 

F

Connect main bus links and sheaths to the anchored 

vertical section

See sections 

4.8.3. Installing the main bus link

4.8.4. Installing 

the main bus insulating sheath

, and 

4.8.5. Additional phases

 for 

detailed instructions on connecting main bus links and sheaths

 

F

Install width setting members

Install two width setting members at the top of the pole units.

 

F

Position the next vertical section

Position the next vertical section on the foundation and next to the 

preceding section, according to the project lineup arrangement 

drawings.

 

F

Attach the vertical section to the previous vertical section

Use one set of

• 

M8-1.25 x 30lg SHCS bolts

• 

M8 wide flat washers (under head of bolt)

• 

M8 wide flat washers (on nut side)

• 

M8 split lock washers (on nut side)

• 

M8 hex nuts

for each attachment point. There are 53 attachment points on each 

Power Xpert IGX vertical section face.

 

F

Attachment torques

Use a torque wrench set for 

26 Nm (19.2 ft-lb

) to fasten all M8 

hardware.

Summary of Contents for Power Xpert IGX

Page 1: ...EATON eaton com IGX Instruction Booklet IB022023EN Effective April 2023 Revision 21 Instructions for the installation and commissioning of Power Xpert IGX medium voltage switchgear...

Page 2: ...w eaton com IGX Instruction Booklet IB022023EN Effective April 20232 Revision 21 Instructions for the installation and commissioning of Power Xpert IGX medium voltage switchgear This page is intention...

Page 3: ...haser of this equipment is the contract between the purchaser and Eaton NO WARRANTIES EXPRESSED OR IMPLIED INCLUDING WARRANTIES OF FITNESS FOR A PARTICULAR PURPOSE OR MERCHANTABILITY OR WARRANTIES ARI...

Page 4: ...4 1 Qualified personnel 17 4 2 Tool and hardware requirements 17 4 3 Initial inspection before setting in place 17 4 3 1 3PS Mech manual operation 17 4 3 2 Checking the gas compartments 23 4 4 Qualifi...

Page 5: ...res necessary to disable machinery or equipment thereby preventing the release of hazardous energy while employees perform servicing and maintenance LV Low Voltage Low voltage is defined as less than...

Page 6: ...RUCTION BOOK SHOULD NOT BE CONSIDERED ALL INCLUSIVE REGARDING INSTALLATION OR MAINTENANCE PROCEDURES IF FURTHER INFORMATION IS REQUIRED YOU SHOULD CONTACT EATON WARNING DO NOT ATTEMPT ANY WORK ON THIS...

Page 7: ...for arc duct installation for Power Xpert IGX arc resistant medium voltage switchgear IB022025EN Renewal parts TD022008EN 1 4 Eaton contact information For additional information about Eaton products...

Page 8: ...the breaker mechanism Failure to do so could result in injuries Do not use a circuit breaker by itself as the sole means of isolating a high voltage circuit Open or ground the associated 3PS for veri...

Page 9: ...tely All tanks are shipped from the factory with the gas filled at rated pressure All vertical section mounted power cable connectors are shipped with dust proof caps installed 2 2 Power Xpert IGX too...

Page 10: ...ing gas During the vertical section or shipping group installation process use a gas leak detector on each Power Xpert IGX shipping group or vertical section to detect any leaking insulating gas Detec...

Page 11: ...clean dry and well ventilated with a constant interior temperature of no less than 23o F 5o C for extended periods of time Check the area periodically for condensation Store the shipping groups uprig...

Page 12: ...an accompanying industry standard ACI 117 90 may be used to establish the flatness and levelness of the finished foundation It is recommended but not necessary to finish the foundation to the same re...

Page 13: ...issioning of Power Xpert IGX medium voltage switchgear Figure 7 ALL DIMENSIONS ARE IN MM INCHES ALL WEIGHTS ARE IN KG LBS ARC DUCT MINIMUM CEILING HEIGHT ABOVE GEAR 300 11 81 MINIMUM CEILING HEIGHT AB...

Page 14: ...l 20232 Revision 21 Instructions for the installation and commissioning of Power Xpert IGX medium voltage switchgear Figure 8 T ALL DIMENSIONS ARE IN MM INCHES ALL WEIGHTS ARE IN KG LBS NOTE SEE FIGUR...

Page 15: ...on 2 Instructions for the installation and commissioning of Power Xpert IGX medium voltage switchgear Figure 9 ALL DIMENSIONS ARE IN MM INCHES ALL WEIGHTS ARE IN KG LBS NOTE 6 5 4 3 3 1 7 8 1 FRONT ED...

Page 16: ...RED LOAD BEARING SURFACE FOR ANCHORING SYSTEM AND EQUIVALENT SUPPORT FLATNESS AND MAXIMUM DEFLECTION SIZING OF STRUCTURAL SUPPORTS TO BE DETERMINED BY SITE ENGINEER 4 FRONT TO REAR STRUCTURAL SUPPORT...

Page 17: ...ration panel on the front of the enclosure This panel will have either one switch control 3PS Mech only or two switch controls when both 3PS Mech and VT 3PS Mech are supplied The Three Position Switch...

Page 18: ...rt Blocking Plate Lock Ground Keylock Padlock Prevent Ground Keylock Padlock Prevent Connect Keylock Padlock Lock Connect Keylock Padlock Blocking plate padlock hasps 3PS Mech manual operation module...

Page 19: ...turned clockwise to its Isolation switch position Cover is swiveled up To open a Blocking Plate remove the padlock from its hasp if applicable and slide the hasp to the left or right as applicable Wit...

Page 20: ...ich port addresses which function For the Isolation access port slide its padlock hasp from the right position preventive to the left position permissive see Figure 16 Rotate the Selector Key Port cov...

Page 21: ...The Blocking Plate moves allowing access to the hex bolt head Figure 18 Isolation Position open close Grounding Position Port selection key accesses manual control 4 When the Isolation access port is...

Page 22: ...20 Figure 20 CW to close Rotate manual operation t handle to close 6 Once the closed position has been reached remove the Manual Operation T Handle Figure 21 Figure 21 RemovingT Handle after closing s...

Page 23: ...kept dry and well ventilated Cable vaults for power and control wiring must be completed with structural supports and anchoring points as shown in Figure 10 Indoor operating conditions for the Power...

Page 24: ...have no Bubbles Scratches Visible damage Foreign material contaminants Evidence of wear If any surface contamination is noticed on any Main Bus component it must be cleaned Remove any dirt oil or grea...

Page 25: ...p phase tanks 3 Position the next vertical section or shipping group next to the one just secured tie bolt the adjacent sections together and secure the added section or group to the foundation 4 Inst...

Page 26: ...g cloths soaked in cleaning solvent see section 2 2 1 Standard accessories included with Power Xpert IGX 4 Apply silicone grease to the VT inner cone connection 5 Lift the VT using the lifting bracket...

Page 27: ...ion 2 Instructions for the installation and commissioning of Power Xpert IGX medium voltage switchgear Figure 26 Attach vertical sections or shipping groups using 53 cap screws flat washers lock washe...

Page 28: ...2023EN Effective April 20232 Revision 21 Instructions for the installation and commissioning of Power Xpert IGX medium voltage switchgear Figure 27 Main Bus VTs Superstructure optional Power Xpert IGX...

Page 29: ...external voltage transformers located remotely from the cable compartment but connected with cable connectors in the Power Xpert IGX cable compartment All cable termination connectors are provided by...

Page 30: ...Xpert IGX medium voltage switchgear Figure 31 Ground bus splice plate installed between vertical sections 4 18 Arc duct installation When required an arc duct system is custom designed for each Power...

Page 31: ...f common tests that may be performed on the Power Xpert IGX switchgear Consult Eaton engineering services for more information Power Xpert IGX test list Voltage withstand test CTs ratio and polarity V...

Page 32: ...cle 4 Remove the VT from the VT port area 5 Install an insulating plug Eaton Catalog Number 83C3662G01 6 Secure the insulating plug to the VT port by tightening the bolts to 13 Nm 115 in lb See Figure...

Page 33: ...positions are correct Control power ON mechanical testing for each Power Xpert IGX vertical section Put the switchgear into the following state the CB is open the 3PS Mech is in disconnect the 3PS Mec...

Page 34: ...connected that the 3PS Mech cannot be moved to GROUND if voltage is detected by the VDS voltage detection system Verify with the 3PS grounded CB closed and Prevent Breaker Open PBO engaged that the CB...

Page 35: ...35 EATON www eaton com IGX Instruction Booklet IB022023EN Effective April 2023 Revision 2 Instructions for the installation and commissioning of Power Xpert IGX medium voltage switchgear Notes...

Page 36: ...36 EATON www eaton com IGX Instruction Booklet IB022023EN Effective April 20232 Revision 21 Instructions for the installation and commissioning of Power Xpert IGX medium voltage switchgear Notes...

Page 37: ...ww eaton com IGX Instruction Booklet IB022023EN Effective April 2023 Revision 2 Instructions for the installation and commissioning of Power Xpert IGX medium voltage switchgear This page is intentiona...

Page 38: ...in USA Publication No IB022018EN TBG 001430 March 2020 Eaton is a registered trademark All other trademarks are property of their respective owners Instruction Booklet IB022023EN Effective April 20232...

Reviews: