UPS Installation Plan and Unpacking
3-18
Eaton
®
Power Xpert
®
9395P-900 UPS Installation and Operation Manual
P-164000501—Rev 09
www.eaton.com/powerquality
Table 3-7. 480V Input/Output Ratings and External Wiring Requirements for the Three/Four UPM Models – Common Battery
Basic Unit Rating
Units
Rating
50/60 Hz
Rating
50/60 Hz
Rating
50/60 Hz
Rating
50/60 Hz
Rating
50/60 Hz
kVA
kW
675
675
750
750
825
825
900
825
900
900
Input and Output Voltage
Volts
480/480
480/480
480/480
480/480
480/480
AC Input to UPS Rectifier (0.98 Minimum pF)
Full load current plus battery recharge current
(3) Phases, (1) Ground
A
Amps
1002
1113
1225
1225
1336
Minimum Conductor Size
Number per Phase
AWG or
kcmil
(each)
500
(4)
500
(4)
500
(5)
500
(5)
500
(5)
AC Input to UPS Bypass
Full Load Current
(3) Phases, (1) Ground
B
Amps
812
902
992
1083
1083
Minimum Conductor Size
Number per Phase
AWG or
kcmil
(each)
500
(3)
500
(3)
500
(4)
500
(4)
500
(4)
DC Input from Battery Disconnect to UPS
(1) Positive, (1) Negative
C
Total
Amps
1480
1645
1809
1809
1974
Minimum Conductor Size
Number per Pole
(1) Positive, (1) Negative
AWG or
kcmil
(each)
500
(8)
500
(8)
500
(10)
500
(10)
500
(10)
AC Output to Critical Load
Full Load Current
(3) Phases, (1) Ground
D
Amps
812
902 992
1083
1083
Minimum Conductor Size
Number per Pole
AWG or
kcmil
(each)
500
(3)
500
(3)
500
(4)
500
(4)
500
(4)
NOTE
V
Callout letters
A
,
B
,
C
, and
D
map to Figure 6-5. Callout letters
A
,
C
, and
D
NOTE
V
Bypass wiring data is not applicable to IOM configurations.
Battery Conductor Sizing
: Eaton strongly recommends using the specified DC conductor size and quantity shown above for optimum
system performance and battery run time.
Battery Cable Routing Requirements
Conduit applications:
* Each conduit must have a Positive, Negative, and Ground conductor.
* There must be an equal number of positive and negative conductors in a single conduit. Only one ground conductor is required in each
conduit.
Raceway applications:
* Positive and negative battery cables must be run side by side in the raceway in an alternating pattern (+ - + - + - + -).
* There must be a ground cable running in the raceway with the battery cables.
NOTE
V
If a 4-pole Automatic Transfer Switch (ATS) is used to connect the UPS to a generator or alternative input source, it may interrupt
the UPS input neutral during its transition between sources. For the 9395 UPS:
The ATS transition must be open in both directions. The "break" time for the contacts must be at least 50 ms. This allows the UPS to
operate properly,
however it is important to evaluate whether the critical load will function properly as its neutral reference is
rapidly (50 ms) switched. Note also that if the UPS load is on bypass, an ATS switchover with interruption of the neutral, will
interrupt the return current path and cause a loss of all phase-to-neutral loads.
If an overlapping neutral or make-before-break ATS switch is used, the neutrals must overlap for a minimum of 50 ms during the
transition.
Summary of Contents for Power Xpert 9395P-900 Series
Page 2: ......
Page 8: ...This page intentionally left blank...
Page 33: ...Section I Installation...
Page 34: ......
Page 139: ...Section II Operation...
Page 140: ......
Page 231: ......
Page 232: ...P 164000501 6 P 164000501 9...