8.
Reinstall the corner channel (see
) and secure using the retained hardware.
9.
Reinstall the left middle panel (see
) and secure using the retained hardware.
Figure 29. ISBM and UPM Sections Joined (Three UPM Section Shown)
UPM Wireway
(Power wiring harnesses are coiled in this area.)
10. Reinstall the left top panel (see
) and secure using the retained hardware.
NOTE
Three flat cabinet joining brackets are provided in the hardware kit for securing the ISBM
and UPM sections at the top front, top rear, and front base (see Steps 11 and 12).
11. Locate the hardware kit (packed inside a drawstring bag tied to the left middle panel of the UPM section).
Locate two flat brackets and screws from the hardware kit. Align the holes in the flat brackets over holes in
the top rear and top front of the ISBM and UPM sections. Secure the brackets with the screws from the
hardware kit (see
).
12. Locate one flat bracket and screws from the hardware kit. Align the holes in the flat bracket over holes in
the front base of the ISBM and UPM sections. Secure the bracket with the screws from the hardware kit
(see
).
13. Proceed to paragraph