ONELINE DRAWINGS AND SCHEMATICS
Power Xpert 9395 Integrated Battery Cabinet (Model 1085 and 1085HR) Installation Manual
S
164201687 Rev 4
www.eaton.com/powerquality
5-4
5.2
Schematics
Figure 5‐5 show the battery cabinet three-pole internal power wiring. Figure 5‐6
through Figure 5‐8 show the battery cabinet breaker CB1 control wiring.
Figure 5‐5. 1085 or 1085HR Battery Cabinet with Three-Pole Breaker Power Wiring Schematic