deterioration of electrical connections. Check area 

where circuit breaker is installed for any safety hazards, 

including personal safety and fire hazards and take 

required precautionary actions. 

Field Testing 

Any field testing should be done in accordance with 

applicable NEMA Standard. The operation of circuit 

breakers with Digitrip OPTIM RMS trip units can be field 

tested periodically using the hand held OPTIMIZER.

(See user manuals.) 

Performance Testing for Ground Fault Trip Units 

Code Requirements 

The National Electrical Code under Article 230-95-C

requires that any ground-fault protection system be per-

formance tested when first installed. The test shall be

conducted in accordance with approved instructions 

provided with the equipment. A written record of this test 

shall be made and shall be available to the authority

having inspection jurisdiction. 

Standards Requirements 

As a follow-up to the basic performance requirements 

stipulated by the N.E.C. as stated above, UL Standard

No. 1053 requires that certain minimum instructions 

GROUND FAULT TEST RECORD FORM 

round Fault Test Records should be Retained by Those in Charge of the Building's 

lectrical Installation  in order to be available to the Authority  having Jurisdiction 

Test Date

Circuit

Breaker

Number

Results

Tested  By 

must accompany each ground fault protection system. 

These following statements plus a copy of the test

record form illustrated in Figure

4-1

are shipped with 

each Digitrip OPTIM RMS trip unit.

General Test 

The interconnected system shall be evaluated in accor-

dance with the equipment assembler's detailed instruc-

tions by qualified personnel. 

The polarity of the neutral sensor connections (if used)

must agree with equipment assembler's detailed instruc-

tions to avoid improper operations following apparently 

correct simulated test operations. Where a question 

exists, consult the specifying engineer and/or equipment 

assembler.

The grounding points of the system shall be verified to

determine that ground paths do not exist that would 

bypass the sensors. The use of high-voltage testers and

resistance bridges may be used. 

WARNING

THERE IS A HAZARD OF ELECTRICAL SHOCK OR

BURN WHENEVER WORKING IN OR AROUND

ELECTRICAL EQUIPMENT. ALWAYS TURN OFF

DUCTING TESTS. 

POWER SUPPLYING BREAKER BEFORE CON-

Source

N

Load

Current Limiting 

Resistor

(if required) 

Figure 4-

1

Typical Performance Test Record Form

Figure 4-2 Connections for Ground Fault Trip Test

Summary of Contents for ND Series

Page 1: ...t IL29C109J Installation Instructions for ND HND NDC CND CHND CNDC Circuit Breakers with Digitrip OPTIM Trip Unit and Powernet and or Zone Interlock Contents Description Page 1 0 Introduction 2 2 0 In...

Page 2: ...for AC applications only and can be reverse fed They are listed in accordance with Underwriters Laboratories Inc Standard UL 489 and satisfy the requirements of International Electrotechnical Commiss...

Page 3: ...ment configuration the cir cuit breaker can be mounted using different styles of hardware The following steps describe how to mount the circuit breaker using standard hardware When special hardware is...

Page 4: ...t Breakers with Digitrip OPTIM Trip Unit and Powernet and or Zone Interlock EATON CORPORATION www eaton com Figure 2 2 Conductor Extensionsand Terminal Installation for 100 Rating 0 31 8 0 31 8 25 Tap...

Page 5: ...le and the PUSH TO TRIP but ton in the trip unit The circuit breaker handle has three positions two of which are shown on the cover with raised letteringto indicate ON and OFF On the handle ON OFF and...

Page 6: ...Bell Alarm Auxiliary Switch is only available on the OPTIM 1050 units If damaged a terminal block cover can be purchased through Eaton The part number is 4214844699 NOTICE 1 It is crucial to connect t...

Page 7: ...roblem Red On White Trip Color Green Off I On Figure 3 1 CircuitBreaker Switch circuit breaker to ON and OFF several times to be sure that the mechanism linkages operate freely and do not bind If mech...

Page 8: ...es that certain minimum instructions GROUND FAULT TEST RECORD FORM round Fault Test Records should be Retained by Those in Charge of the Building s lectrical Installation in order to be available to t...

Page 9: ...rough the neutral sensor as shown in Figure 4 3 The breaker should not trip and the alarm indicator if supplied should not operate Repeat the test on the other two phases Source L Low Load Current Lim...

Page 10: ...eaflet IL29C109J Effective November 2013 Installation Instructions for ND HND NDC CND CHND CNDC Circuit Breakers with Digitrip OPTIM Trip Unit and Powernet and or Zone Interlock EATON CORPORATION www...

Page 11: ...eaflet IL29C109J Effective November 2013 Installation Instructions for ND HND NDC CND CHND CNDC Circuit Breakers with Digitrip OPTIM Trip Unit and Powernet and or Zone Interlock EATON CORPORATION www...

Page 12: ...further information is required you should consult an authorized Eaton sales representa tive The sale of the product shown in this literature is subject to the terms and conditions outlined in appropr...

Reviews: