
Installing Battery Cabinets
3-2
EATON
Powerware
®
9390 Integrated Battery Cabinet (Models IBC-S and IBC-L) Installation Manual
S
164201536 Rev D
www.eaton.com/powerquality
3.2 Unloading the Battery Cabinet from the Pallet
The battery cabinet is bolted to a pallet consisting of four angle metal supports secured to
two four-inch by six-inch wood supports.
1.
Unfasten front door latch and swing doors open.
2.
Remove doors. Remove the retaining screw located inside each door at the
bottom hinge pivot point, then lift the door off. Save the retaining screws for
reinstallation of the doors.
3.
Locate the field kit (packed inside of the cabinet). Locate the four 1/2
I
jacking
bolts and install them in the threaded holes in the front and rear supports. Place a
floor protector underneath each jacking bolt, and screw the bolts down against
them. The floor protectors protect the floor from being marred by the jacking
bolts.
Floor Protector
(Step 3)
Left-hand
Door (Step 1)
4
6 Support
Front Support
4
6 Support
Jacking Bolt
(Step 3)
Side Support
Cabinet Support
Hardware (Step 9)
Figure 3‐1. Removing Shipping Supports
4.
Loosen, but do not remove, the hardware holding the 4
6 supports to the front
and rear supports.
W
A
R
N
I
N
G
SERIOUS INJURY MAY OCCUR. Battery cabinets are extremely heavy. If unloading instructions
are not closely followed, cabinet may tip.