Eaton 93PM Integrated Battery Cabinet (IBC-L, IBC-LH [432V], and IBC-LH [480V]) Installation Manual 164000228—Rev 08
39
Figure 17. Top Ventilation
Cover
Ventilation
Plate
Grill
Top
View
Front
Back View
44..33
IInnssttaalllliinngg IIB
BC
C P
Poow
weerr W
Wiirriinngg
IBCs can be installed in a line-up-and-match configuration with the power wiring routed through the bottom of
the IBCs and UPS cabinet or in a standalone configuration with the power wiring routed between the IBCs and
the UPS cabinet using conduit. Use the appropriate procedure for the type of installation being wired.
44..33..11
LLiinnee--U
Upp--aanndd--M
Maattcchh P
Poow
weerr W
Wiirriinngg
NOTE 1
All battery cabinets will be directly connected to the UPS and not daisy-chained between
each cabinet. All power wiring between the IBCs and the UPS is factory supplied.
NOTE 2
Up to four IBCs can be installed in a line-up-and-match configuration.
NOTE 3
If installing three or four IBCs, longer battery power cables are packed with IBC 3 and
IBC 4. Ensure the longer cables are used to wire IBC 3 and IBC 4.
Use this procedure to wire line-up-and-match 93PM Integrated Battery Cabinets to the 93PM UPS cabinet.
To install wiring to connections:
1.
Verify the UPS system is turned off and all power sources are removed. Refer to the applicable Eaton
93PM UPS Installation and Operation manual, listed in paragraph
, for UPS
operating procedures.
2.
Open the front door by lifting the latch from the bottom and turning to the right (counterclockwise) and
swing the door open.
Summary of Contents for IBC-L