11
Installation Guide
GREEN MOTION BUILDING PRO
www.eaton.com
C
Remove the middle panel .
If you have a dual pedestal, remove the 1/4”-20 Hex
head bolt, neoprene washer, and 1/4”-20 serrated
flange nut .
For all pedestals, remove the top and bottom panels .
On the front of the pedestal, remove the four 1/4”-
20 Hex head bolts, neoprene washers, and 1/4”-20
serrated flange nuts .
Remove NEMA plug .
Only remove second NEMA plug if you intend to
connect to ethernet .
STEP C-1
STEP C-2
Mount an EV charger to a pedestal
Top panel
Bolt, washer, nut
Bolt, washer, nut
Bolts, washers, nuts
Middle panel
Bottom panel
NEMA plug
NEMA plug
(Ethernet)