Flexi -3G Installation & Commissioning Manual
Chapter 1. Introduction
Document No: - 4493-CM-EN-10989402
Page 7 of 94
Copyright © 2008-2009 Eaton Corporation. All Rights Reserved
1.8. Directives & Standards
Eaton power systems have invoked the following directives and standards.
•
LVD and EMC directives 2006/95/EC, 2004/108/EC and 1999/5/EC
respectively, by invoking EN60950-1, EN300-386 and EN301-489-1.
•
ROHS Directive 2002/95/EC on the restriction of the use of certain
hazardous substances in electrical and electronic equipment.
This Telecommunications Power Supply System complies with or exceeds the following Standards:
•
Electromagnetic
Directive.
•
EN60950-1: Information Technology Equipment – Safety. Part 1: General
Requirements.
•
EN300 386: Electromagnetic Compatibility and Radio Spectrum Matters (ERM);
Telecommunications Network Equipment; Electromagnetic Compatibility (EMC)
requirements.
•
EN301-489-1:
Electromagnetic Compatibility and Radio Spectrum Matters (ERM),
Electromagnetic Compatibility (EMC) standard for radio equipment and services, Part
1: Common Technical Requirements.
This Telecommunications Power Supply System output is classed as earthed SELV at a hazardous
energy level.