Flexi -3G Installation & Commissioning Manual
Chapter 6. Installation of AC Cables
Page 58 of 94
Document No: - 4493-CM-EN-10989402
Copyright © 2008-2009 Eaton Corporation. All Rights Reserved
6.5. AC Installation for PBA-02
4
AC 3 Pole Isolator
5
Surge Arrestor (Optional)
15 6 x AC Neutral Connectors
16 Earth
Connector
19 Rectifier
MCBs
Fig. 6-4 AC Distribution Panel PBA-02
6.5.1. AC Wiring Option
4
AC 3 Pole Isolator
5
Surge Arrestor (Optional)
15
6 x Connectors for internal
connections
16 Earth Connector
17 2-way link bar
Fig. 6-5 AC Connections to Power Box PBA-02
Tighten the Earth Connector terminal screw to a torque of 5.6Nm.
Tighten the Isolator terminal screws to a torque of 2.5Nm
5
16
15
4
17
PE
Ø1
Ø3
Ø2
5
16
4
15
19