![background image](http://html1.mh-extra.com/html/eaton/cutler-hammer-g-series/cutler-hammer-g-series_instruction-leaflet_3897052002.webp)
Page 2
IL01222026E
Effective Date 11/07
2
Remove existing four screws from secondary
cover of breaker.
3
Assemble support onto the breaker with four
mounting screws supplied. Torque to 0.44 to 0.6
N.m or 4 to 5 in. lb.
4
•
Turn breaker to the “OFF” position first.
•
Line up breaker handle and molded trigger of
motor operator, and position motor operator on
the breaker.
5
Mount motor operator to breaker using mounting
screws and Lock washers and Flat washers
supplied. Torque to 0.44 to 0.6 N.m or 4 to 5 in. lb.
Support
Molded Trigger
Mounting Screws
(10 mm length)
Springwashers,
Lock washers, Flat
washers
Breaker Handle
Mounting Screws
(18 mm length)
Mounting Screws
(16 mm length)