background image

All  statements,  technical  information  and  recommendations  contained  herein  are  based  on  information  and  tests  we  believe  to  be  reliable.  The  accuracy  or 

completeness thereof are not guaranteed. In accordance with Crouse-Hinds “Terms and Conditions of Sale,” and since conditions of use are outside our control, 

the purchaser should determine the suitability of the product for his intended use and assumes all risk and liability whatsoever in connection therewith.

 

Eaton’s Crouse-Hinds Business               

IF 1711

1201 Wolf Street, Syracuse, New York 13208  •  U.S.A. 

Revision 2

Copyright© 2014 

Revised 10/14 

Supersedes 09/14

VisoR instAllAtion instRUctions

1.  Remove power from floodlight.

2.  Place floodlight face up.

3.  Carefully align visor with two (2) screw holes at the top of the fixture 

shown in the image above.

4.  Install screws provided with visor, taking care to not scratch the finish of 

the floodlight. Torque to 80 in-lbs (9.0 N-m).

5.  Install floodlight per above instructions.

notE:

  Visor can be installed before or after floodlight has been in operation.  

GUARD instAllAtion instRUctions

1.  Remove power from floodlight.

2.  Place floodlight face up.

3.  Carefully align guard with four (4) screw holes on each side of the 

fixture shown in the image above.

4.  Install screws provided with guard taking care to not scratch the finish 

of the floodlight.  Torque to 80 in-lbs (9.0 N-m).

5.  Install floodlight per above instructions.

notE:  

Guard can be installed before or after floodlight has been in             

     operation. 

notE: 

 Visor and guard can both be used on a floodlight at the same time.                

     Visor and guard are always installed in the field and are not factory  

 

     installed.

Reviews: