1.
Verify that the UPS system is turned off and all power sources are removed. Refer to the
Eaton
®
BladeUPS
®
User’s Guide (Preassembled and Standard Systems) For use with Eaton BladeUPS 5.1 kVA to
60 kVA (N+1) systems
for shutdown instructions.
NOTE
Before connecting wiring to the UPS, ensure the UPS is grounded.
NOTE
Refer to the
Eaton
®
BladeUPS
®
User’s Guide (Preassembled and Standard Systems)
For use with Eaton BladeUPS 5.1 kVA to 60 kVA (N+1) systems
for UPS cabinet
terminal locations.
2.
Connect the ground wire to the cabinet ground lug (see Figure 3-4)
Ground Lug
Ground Bar
Neutral Bar
Terminal Block
(communication/control)
UPS Output Breaker (UOB)
Maintenance Bypass
Breaker (MBB)
Rectifier Input Breaker
(RIB)
Neutral Bar
Ground Bar
Figure 3-4. MBC with covers removed