![Eaton BladeUPS none Installation And Operation Manual Download Page 22](http://html1.mh-extra.com/html/eaton/bladeups-none/bladeups-none_installation-and-operation-manual_3708108022.webp)
Installation
3-4
Eaton BladeUPS 12 kVA Maintenance Bypass Cabinet Installation and Operation Manual P-164000130—Rev 1
www.eaton.com/powerquality
4.
Inside the vent cover openings, locate the four 3/8-inch bolts (two in front and two in back) that secure the
MBC to the pallet (see Figure 3-2). Using the socket, extension, and ratchet, remove the bolts. Discard the
bolts.
Figure 3-2. Removing the Pallet Bolts
WARNING
Do not stand directly in front of the pallet while unloading the cabinet. If unloading instructions are
not closely followed, the cabinet may cause serious injury.
3.1.3
Installing the Cabinet
To install the cabinet:
1.
Prepare the installation site for securing the cabinet to the floor. See Appendix Figure A-1 for the location
of the four anchor bolt locations.
2.
Place the forks of the forklift in the specified location to lift the cabinet from the pallet (see Figure 3-3).
Summary of Contents for BladeUPS none
Page 65: ......
Page 66: ...164201690 4 P 164000130 1...