Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07
101
The Normal status indicator is illuminated.
77..33..22
S
Sttaarrttiinngg tthhee U
UP
PS
S iinn B
Byyppaassss M
Mooddee
If the inverter output of the UPS is not available and the critical load needs to be energized:
CAUTION
In Bypass mode, the critical load is not protected from commercial power interruptions and abnormalities.
1.
Close the UPS input feeder circuit breaker.
2.
If dual feed, close the UPS bypass feeder circuit breaker.
3.
If IBCs are installed, close the battery breakers.
4.
Observe the UPS control panel display becoming active, indicating logic power.
5.
Verify no alarms are active.
6.
Tap the
CONTROLS
tab on the main menu navigation bar. The System Control screen is displayed.
7.
Tap the
GO TO BYPASS
button.
The critical load is immediately supplied by the bypass source, in Bypass mode.
The
BYPASS
status indicator is illuminated.
77..33..33
S
Sttaarrttiinngg tthhee U
UP
PM
Mss
To start the power modules without transferring the critical load to Double Conversion mode:
1.
Close the UPS input feeder circuit breaker.
2.
If dual feed, close the UPS Bypass input feeder circuit breaker.
3.
Observe the UPS control panel becoming active, indicating logic power.
4.
Verify no alarms are active.
5.
Tap the
CONTROLS
tab on the main menu navigation bar. The System Control screen is displayed.
6.
Tap the
MODULES CONTROLS
tab on the secondary Control menu navigation bar. The UPM Select
screen is displayed.
7.
On the UPM Select screen, select UPM 1. The UPM Control Screen is displayed.
8.
Tap the
START MODULE
button.
The UPM 1 rectifier and inverter turn on. When the inverter reaches full voltage, the UPS is ready to
transfer to the Double Conversion mode and supply the critical load.
9.
Repeat Steps
through
selecting UPM 2 to start UPM 2.
The UPM 2 rectifier and inverter turn on. When the inverter reaches full voltage, the UPS is ready to
transfer to the Double Conversion mode and supply the critical load.
10. Repeat Steps
through
selecting UPM 3 to start UPM 3.
The UPM 3 rectifier and inverter turn on. When the inverter reaches full voltage, the UPS is ready to
transfer to the Double Conversion mode and supply the critical load.
77..33..44
S
Sttaarrttiinngg aa S
Siinnggllee U
UP
PM
M
To Start a single UPM:
1.
Close the UPS input feeder circuit breaker.
Summary of Contents for 93PM Series
Page 4: ......
Page 138: ...16400022707 164000227 07 ...