14
Eaton 93PM-L 20–200kW (208V) UPS Installation and Operation Manual 164000724—Rev 01
Table 1. Air Conditioning or Ventilation Requirements During Full Load Operation (Continued)
Model
UPS Rating
Max Heat Dissipation at
100% Load
KW (BTU/Hr)
Minimum Required Cooling
Air Flow
Eaton 93PM-L 200-10
190 kW
17.05 (58189)
873 liter/sec (1850 cfm)
Eaton 93PM-L 200-10
200 kW
17.95 (61251)
873 liter/sec (1850 cfm)
The UPS equipment operating environment must meet the weight requirements shown in
and the size
requirements shown in
through
. Dimensions are in millimeters (inches).
Table 2. UPS Cabinet Weights
Model
Weight kg (lb)
Shipping
Installed
Point Loading
Eaton 93PM-L 200 with 1 UPM
Installed
543 (1194)
484 (1064)
8 at 61 (133)
Eaton 93PM-L 200 with 2 UPMs
Installed
574 (1263)
515 (1133)
8 at 64 (142)
Eaton 93PM-L 200 with 3 UPMs
Installed
605 (1332)
546 (1202)
8 at 68 (150)
Eaton 93PM-L 200 with 4 UPMs
Installed
637 (1401)
578 (1271)
8 at 72 (159)
Eaton 93PM-L 200 with 5 UPMs
Installed
668 (1470)
609 (1340)
8 at 76 (168)
Eaton 93PM-L 200 with 6 UPMs
Installed
699 (1539)
640 (1409)
8 at 80 (176)
Eaton 93PM-L 200 with 7 UPMs
Installed
731 (1608)
672 (1478)
8 at 84 (185)
Eaton 93PM-L 200 with 8 UPMs
Installed
762 (1677)
703 (1547)
8 at 88 (193)
Eaton 93PM-L 200 with 9 UPMs
Installed
794 (1746)
735 (1616)
8 at 92 (202)
Eaton 93PM-L 200 with 10 UPMs
Installed
825 (1815)
766 (1685)
8 at 96 (211)
The UPS cabinet uses forced air cooling to regulate internal component temperature. Air inlets are in the front
of the cabinet and outlets are on top or in the back of the cabinet. Allow clearance in front of and on top or in
back of the cabinet for proper air circulation. The clearances required around the UPS cabinet are shown in
.
Summary of Contents for 93PM-L IAC-B
Page 162: ...16400072401 164000724 01 ...