Eaton 93PM UPS (400kW Frame) Seismic Mounting Bracket Install Instructions
P-164000774—Rev 01
3
Figure 2. Front Seismic Mounting Bracket Installation
Seismic Mounting
Front Seismic
Brackets (2)
Floor Mounting
Holes (4 places per bracket)
Bracket Bolts
(4 places per bracket)
Figure 3. Rear Seismic Mounting Bracket Installation
Rear Seismic
Brackets (2)
Rear Mounting
Holes (4 please per
bracket)
Bracket Bolts
(4 places per
bracket)
Eaton 93PM UPS (400kW Frame) Seismic Mounting Bracket Installation Instructions