background image

Eaton 93PM UPS (400kW Frame) Seismic Mounting Bracket Install Instructions

P-164000774—Rev 01

3

Figure 2. Front Seismic Mounting Bracket Installation

Seismic Mounting

Front Seismic

Brackets (2) 

Floor Mounting

Holes (4 places per bracket)

Bracket Bolts

(4 places per bracket)

Figure 3. Rear Seismic Mounting Bracket Installation

Rear Seismic

Brackets (2) 

Rear Mounting

Holes (4 please per

bracket)

Bracket Bolts

(4 places per

bracket)

Eaton 93PM UPS (400kW Frame) Seismic Mounting Bracket Installation Instructions

Reviews: