Eaton 9395XC UPS 1200kW/1200kVA, 1350kW/1350kVA or 1500kW/1500kVA 164001079—Rev 01
101
C
Chhaapptteerr 77 U
UP
PS
S O
Oppeerraattiinngg IInnssttrruuccttiioonnss
This section describes how to operate the UPS.
NOTE 1
Before starting the UPS, ensure all installation tasks are complete and a preliminary
startup has been performed by authorized service personnel. The preliminary startup
verifies all electrical interconnections to ensure the installation was successful and the
system operates properly.
NOTE 2
Read this section of the manual and have thorough knowledge of UPS operation before
attempting to operate any of the controls.
NOTE 3
The UPS displays two minutes of battery runtime at the initial startup. After a 24-hour
charging period, the UPS automatically runs a battery test and the correct battery
runtime displays.
77..11
U
UP
PS
S C
Coonnttrroollss
The controls identified and described in this section are used to control and monitor UPS operation.
Identifies the location of the touchscreen control panel.
Figure 57. UPS Controls