Installation
4-8
Eaton
®
Power Xpert
®
9395C UPS Installation and Operation Manual P-164000821—Rev 01
www.eaton.com/powerquality
ATTENTION!
Lors de l’installation, prendre soin de protéger les composantes du côté droit du module de
contournement de système intégré (ISBM) et les faisceaux de câbles reliant les armoires du côté
gauche du module d’alimentation universel (PM).
4.
Using a forklift with the forks in the front forklift slots, position the ISBM section adjacent to the left side
of the previously installed PM section. Verify that the ISBM section right side is against the PM section
left side and the front of the cabinet bases are flush with each other (see Figure 4-6).
Figure 4-6. ISBM and PM Sections Joined
5.
Locate the hardware kit (packed inside a drawstring bag tied to the ISBM section). Locate two flat
brackets and screws from the hardware kit. Align the holes in the flat brackets over holes in the top rear
and top front of the ISBM and PM sections. Secure the brackets with the screws from the hardware kit
(see Figure 4-7).
NOTE
Clearance between the ISBM and the PM sections must be less than 1/2” so that
joining brackets can be installed.
ISBM Wireway
(Power wiring harnesses are coiled in this area.)
ISBM
PM
NOTE
Three flat cabinet joining brackets are provided in the hardware kit for securing the
ISBM and PM sections at the top front, top rear, and front base (see Steps 11 and
12).
Summary of Contents for 9395C-1000/1000
Page 2: ......
Page 23: ...Section I Installation ...
Page 24: ......
Page 93: ...Section II Operation ...
Page 94: ......
Page 155: ......
Page 156: ... P 164000821 1 P 164000821 1 ...