Page 1: ...66A5400H01 1 Instruction Booklet for the Installation Operation and Maintenance of Type 5 15 kV VCP WG Vacuum Circuit Breaker 4000A MiniMod Eaton Corporation Moon Twp PA U S A 15108 ...

Page 2: ...AT PERSONNEL ARE ALERT TO WARNINGS WHICH MAY APPEAR THROUGHOUT THE DOCUMENT IN ADDITION CAUTIONS ARE ALL UPPER CASE AND BOLDFACE AS SHOWN BELOW CAUTION COMPLETELY READ AND UNDERSTAND THE MATERIAL PRESENTED IN THIS DOCUMENT BEFORE ATTEMPTING INSTALLATION OPERATION OR APPLICATION OF THE EQUIPMENT IN ADDITION ONLY QUALIFIED PERSONS SHOULD BE PERMIT TED TO PERFORM ANY WORK ASSOCIATED WITH THE EQUIPMEN...

Page 3: ...s in the disconnected test or removed position All primary bus conductors and connections are insulated with track resistant fluidized bed epoxy coating for rated maximum voltage of the assembly Mechanical interlocks are provided to maintain a proper and safe operating sequence Instruments meters relays secondary control devices and their wiring are isolated where necessary by grounded metal barri...

Page 4: ...66A5400H01 4 Figure 1 View of the 4000A MiniMod with part descriptions ...

Page 5: ...66A5400H01 5 Figure 2 Outline drawing with reference dimensions ...

Page 6: ...66A5400H01 6 Figure 3 and 4 View of the breaker in the text and connected positions ...

Page 7: ...66A5400H01 7 Figure 5 View of the breaker on the rails getting ready to be racked in the MiniMod Figure 6 View of the breaker racked in the MiniMod ...

Page 8: ...66A5400H01 8 Figure 7 View inside the MiniMod ...

Page 9: ... the installation process MiniMod Operational Inspection It is best to perform this testing with the MiniMod on the pallet outside of the switchgear We do not suggest you mount the MiniMod in the switchgear and then perform these tests Testing with just the breaker and MiniMod allows for the user to see the operation from all sides and avoid any damage to the breaker and or MiniMod Test the operat...

Page 10: ...manent record of all inspections maintenance performed actions taken observations made and measurements taken Not only will this provide valuable historical information it can help to establish whether or not the present schedule needs to be adjusted 6 Perform ongoing visual inspections when possible of all equipment on a regular basis Be alert for an accumulation of dirt in and around the primary...

Page 11: ...thly Replace any worn or defective wiring e Shutter operating mechanism Visually inspect the proper operation of the shutter drivers If binding is found then remove the foreign elements causing the binding If parts are found bent or damaged then replace the damaged parts If required grease the moving components f Levering In operating mechanism Visually inspect the proper operation of the levering...

Page 12: ...NTIES EXPRESSED OR IMPLIED INCLUDING WARRANTIES OF FITNESS FOR A PARTICULAR PURPOSE OR MERCHANTABILITY OR WARRANTIES ARISING FROM COURSE OF DEALING OR USAGE OF TRADE ARE MADE REGARDING THE INFORMATION RECOMMENDATIONS AND DESCRIPTIONS CONTAINED HEREIN In no event will Eaton be responsible to the purchaser or user in contract in tort including negligence strict liability or otherwise for any special...