I.B. 3A74792H08
Page v
Effective
09/2014
Page
5-3.1 Operation of Stored Energy Mechanism ..................................................................................... 23
5-3.2 Charging
....................................................................................................................................... 23
5-3.3 Closing
Operation
................................................................................................................... 25
5-3.4 Tripping
Operation
.................................................................................................................. 25
5-4 Control
Schemes
................................................................................................................................. 25
5-4.1 Timing
..................................................................................................................................... 25
5-4.2 Secondary Disconnects .......................................................................................................... 25
5-4.3 Secondary
Terminal
Blocks
.................................................................................................... 29
5-4.4 Undervoltage
Trip Device........................................................................................................ 29
5-5 Interlocks
and
Interfacing
.................................................................................................................... 30
5-6
Levering Mechanism (VCP-W Only) .................................................................................................... 30
5-7 Operations
Counter
............................................................................................................................. 30
5-8 Ground
Contact
................................................................................................................................... 30
5-9
MOC and TOC Switch Operations ....................................................................................................... 30
SECTION 6: INSPECTION, MAINTENANCE AND TROUBLESHOOTING
6-1 Introduction
......................................................................................................................................... 32
6-2
Frequency of Inspection and Maintenance .......................................................................................... 32
6-2.1
Qualified
Personnel
............................................................................................................... 32
6-2.2
Helpful Tools and Accessory Items ....................................................................................... 32
6-2.3 General
Torque Guidelines ................................................................................................... 32
6-3
Inspection and Maintenance Procedures ............................................................................................. 35
6-4
Vacuum Interrupter Integrity Test ........................................................................................................ 36
6-5 Contact
Erosion
................................................................................................................................... 36
6-6 Contact
Wipe
....................................................................................................................................... 36
6-7 Insulation
............................................................................................................................................. 37
6-8 Insulation
Integrity
Check
.................................................................................................................... 37
6-9 Primary
Circuit
Resistance Check ....................................................................................................... 37
6-10 Mechanism
Check
............................................................................................................................... 39
6-10.1 CloSure
TM
Test ...................................................................................................................... 39
6-11 Lubrication
........................................................................................................................................... 43
6-12 Troubleshooting
Chart
......................................................................................................................... 43
SECTION 7: RENEWAL PARTS
7-1
General .............................................................................................................................................. 46
7-1.1 Ordering
Instructions
............................................................................................................. 46
FIGURES
Figure
Title
Page
1-1
Type VCP-W 38kV Drawout Circuit Breaker Outlines and Dimensions ................................................. 6
1-2
Type VCP-WR 38kV Fixed Circuit Breaker Outlines and Dimensions ................................................... 7
3-1
Circuit Breaker Shown Mounted with Ramp Still in Shipping Position (VCP-W Only) .......................... 10
3-2
Circuit Breaker Shown Being Moved Carefully Down Attached Ramp (VCP-W Only) ......................... 10
3-3
Optional Fifth Wheel Shown in Use (VCP-W Only) .............................................................................. 10
3-4
Front View VCP-W 38kV Drawout Vacuum Circuit Breaker ................................................................. 12
3-5
VCP-W or VCP-WR 38kV Vacuum Circuit Breaker with Front Cover Removed .................................. 13
3-6
Rear View VCP-W 38kV Drawout Vacuum Circuit Breaker ................................................................. 14
3-7
Rear View VCP-WR Fixed Vacuum Circuit Breaker ............................................................................ 15
Summary of Contents for 380 VCP-W 21
Page 2: ......
Page 13: ...I B 3A74792H08 Page 7 Effective 09 2014 ...
Page 22: ...Page 16 I B 3A74792H08 Effective 09 2014 Figure 3 7 Typical VCP W 38kV Escutcheon ...
Page 23: ...I B 3A74792H08 Page 17 Effective 09 2014 Figure 3 8 Typical VCP W 38kV Escutcheon ...
Page 33: ...I B 3A74792H08 Page 27 Effective 09 2014 compartment Figure 5 5 Charging Schematic ...
Page 38: ...Page 32 I B 3A74792H08 Effective 09 2014 Figure 5 10 Undervoltage Trip Device Configuration ...
Page 60: ...Page 54 I B 3A74792H08 Effective 09 2014 ...
Page 62: ...Page 56 I B 3A74792H08 Effective 09 2014 Style 3A74792H08 Printed in USA ...