STEP THREE - INSTALLING THE UNDERLAYMENT AND LINER
Run the protective underlayment
in the pond and up the stream (if
one is installed). The underlayment
should overhang the stream bed
and be up to the bottom of the fi lter
box. Lay the liner in the pond over
the underlayment. Work as many
wrinkles out of the liner as pos-
sible. The liner should be run up the stream or to the fi lter box.
Folder the liner over the Spliner Lock. Slide the Spliner Bar
into the spline channel and secure with the Spliner Locks. Be
sure to leave plenty of extra liner going to the fi lter box. The liner should not be tight. Trim the excess
liner and underlayment later, after the installation is complete.
STEP FOUR - FINISHING UP
Lay the fi lter mats in the bottom of the fi lter box on top of the sup-
port tubes or support stands depending on model.
Place the supplied Bio-Max
media bags on top of the fi lter
pads, making sure they are
snug into the corners. Cover
the top of the fi lter box with a
fl agstone or fi lter cover.
Stack stones up the front of the
falls fi lter to conceal the fi lter box
and liner. Additional stone can be added on top, just below the lip, to
extend the waterfall.
You may also want to put
a piece of fl agstone in
the mouth of the falls to
hide the weir and to make
a more natural looking
water feature.
“Spliner Lock”
“Spliner
Bar”
Pond Liner
Spillway - End
aa
View