background image

PA10 • PA12 • PA33 • PA50 • PA60 • PA75 • PA100

and Windmill Aeration Systems

Diffused Aeration Systems

Installation • Operating

Maintenance Guidelines

Save this booklet for future reference!

Manuals also available on our website:

www.EasyProPondProducts.com

Summary of Contents for PA10

Page 1: ...A60 PA75 PA100 and Windmill Aeration Systems Diffused Aeration Systems Installation Operating Maintenance Guidelines Save this booklet for future reference Manuals also available on our website www Ea...

Page 2: ...t maximum circula tion is sustained Systems that operate a few hours each day will just get the circulation going and then it is time to shut off If you are installing this system at a time when your...

Page 3: ...ection using the clamp provided 4 Position the PVC manifold and airstones onto the white plastic underlay Use the plastic straps provided to attach the manifold to the underlay 5 Attach the other end...

Page 4: ...mmended that the pond diffuser be in stalled at this point This will allow you to trim any unused pipe before attaching to the pump Once installed and trimmed attach the other end of the tubing to the...

Page 5: ...installed and trimmed attach the other end of the tubing to the flexible hose on the compressor 6 Connect the valved outlet assembly to the compressor 7 Connect the tubing to the flex hose on the com...

Page 6: ...attaching to the pump Once installed and trimmed attach the other end of the tubing to the flexible hose on the compressor 6 Connect the valved outlet assembly to the compressor 7 Connect the tubing t...

Page 7: ...ing com pletely before attempting to install the diffuser as sembly in your pond Tubing needs to be weighted to sink Usually a three to five pound weight every six to eight feet is ade quate Weights c...

Page 8: ...de the RA number original receipt in the form of an invoice or sales receipt name return address and phone number inside of the package No warranty claims will be honored without the original receipt...

Reviews: