background image

All MOBI towers and components must be checked regularly for damage such as dents, cracks, buckling and the like. 
If found the MOBI component must not be used. Damaged components are easily replaced, and must be so before 
further use. Contact your supplier.

MAINTENANCE

COMPONENTS

COLOUR CODING

GREEN 

 Diagonal 

Bracing

PURPLE

   

Plan Brace 

BLACK 

 

Ledgers, 

Handrails, 

Midrails

FHM360

Multi Ladder Frame

HFF300

Guard Rail Frame

CA200

Adjustable 200mm 

Casters

PFS425

 Standard Platform 

(not required for single 

width 800 Series models)

PFA425

Access Platform

TBP480

 Toeboard

GRB300

Guard Rail/Ledger

PBA745

Plan Brace

ACB100

Diagonal Brace

STEP 1:

Attach Casters to the 
two Base Frames 
and tighten Wingnuts. 
Casters should be 
Locked.

STEP 3:

Fit Red coded Plan Brace on 
diagonally opposite corners of 
the tower immediately above the 
collars on the frame.

STEP 5:

Install platforms side by side on 
the applicable frame transom 
(cross member). If extra frame 
lifts are to be added, install the 
platforms on the top transom 
as shown. This will assist in the 
erection of the upper frames. 
Ensure the base is level on both 
planes by adjusting Caster Screw 
Jacks.

Note: single width frames will only 

have one access platform included.

STEP 2:

Fit black coded Ledgers to 
vertical Standards immediately 
above the lowest transom as 
shown. One on each side of 
the Frame with Grasper hooks 
facing outwards. These will 
hold the Frames upright while 
other bracing is attached.

Note; ensure the locking hooks on 

each grasper are fully engaged.

ASSEMBLY INSTRUCTIONS - FOR MOBI TOWERS

STEP 4:

Fit one end of a green coded 
Diagonal Brace to the second 
transom up from the base of one 
frame. Fit the other end of the 
brace to the second transom 
down from the top of the 
opposite frame. The brace should 
be positioned immediately inside 
the vertical frame members  on 
one side.
Repeat the process  for a second diagonal  brace on 
the opposite  side. The braces  must be installed  at 
opposing angles  to each other as shown.

If Tower is set up 

over two levels high 

then Outriggers must 

be attached to the 

Standards as shown.

Outrigger 

Clamps

If Tower is set up

over two levels high 

then Outriggers must 

be attached to the 

Standards as shown.

Outrigger 

Clamps

Toeboard

Guardrail & Midrail

Angle Brace

Spring clip

Locked

Unlocked

Wingnut

Wingn

Ledgers

Plan Brace

Diagonal Brace

If Tower is set up 

over two levels high 

then Outriggers must 

be attached to the 

Standards as shown.

Outrigger 

Clamps

If Tower is set up

over two levels high 

then Outriggers must 

be attached to the 

Standards as shown.

Outrigger 

Clamps

Toeboard

Guardrail & Midrail

Angle Brace

Spring clip

Locked

Unlocked

Wingnut

Wingn

Ledgers

Plan Brace

Diagonal Brace

If Tower is set up 

over two levels high 

then Outriggers must 

be attached to the 

Standards as shown.

Outrigger 

Clamps

If Tower is set up

over two levels high 

then Outriggers must 

be attached to the 

Standards as shown.

Outrigger 

Clamps

Toeboard

Guardrail & Midrail

Angle Brace

Spring clip

Locked

Unlocked

Wingnut

Wingn

Ledgers

Plan Brace

Diagonal Brace

If Tower is set up 

over two levels high 

then Outriggers must 

be attached to the 

Standards as shown.

Outrigger 

Clamps

If Tower is set up

over two levels high 

then Outriggers must 

be attached to the 

Standards as shown.

Outrigger 

Clamps

Toeboard

Guardrail & Midrail

Angle Brace

Spring clip

Locked

Unlocked

Wingnut

Wingn

Ledgers

Plan Brace

Diagonal Brace

If Tower is set up 

over two levels high 

then Outriggers must 

be attached to the 

Standards as shown.

Outrigger 

Clamps

If Tower is set up

over two levels high 

then Outriggers must 

be attached to the 

Standards as shown.

Outrigger 

Clamps

Toeboard

Guardrail & Midrail

Angle Brace

Spring clip

Locked

Unlocked

Wingnut

Wingn

Ledgers

Plan Brace

Diagonal Brace

Reviews: