All MOBI towers and components must be checked regularly for damage such as dents, cracks, buckling and the like.
If found the MOBI component must not be used. Damaged components are easily replaced, and must be so before
further use. Contact your supplier.
MAINTENANCE
COMPONENTS
COLOUR CODING
GREEN
Diagonal
Bracing
PURPLE
Plan Brace
BLACK
Ledgers,
Handrails,
Midrails
FHM360
Multi Ladder Frame
HFF300
Guard Rail Frame
CA200
Adjustable 200mm
Casters
PFS425
Standard Platform
(not required for single
width 800 Series models)
PFA425
Access Platform
TBP480
Toeboard
GRB300
Guard Rail/Ledger
PBA745
Plan Brace
ACB100
Diagonal Brace
STEP 1:
Attach Casters to the
two Base Frames
and tighten Wingnuts.
Casters should be
Locked.
STEP 3:
Fit Red coded Plan Brace on
diagonally opposite corners of
the tower immediately above the
collars on the frame.
STEP 5:
Install platforms side by side on
the applicable frame transom
(cross member). If extra frame
lifts are to be added, install the
platforms on the top transom
as shown. This will assist in the
erection of the upper frames.
Ensure the base is level on both
planes by adjusting Caster Screw
Jacks.
Note: single width frames will only
have one access platform included.
STEP 2:
Fit black coded Ledgers to
vertical Standards immediately
above the lowest transom as
shown. One on each side of
the Frame with Grasper hooks
facing outwards. These will
hold the Frames upright while
other bracing is attached.
Note; ensure the locking hooks on
each grasper are fully engaged.
ASSEMBLY INSTRUCTIONS - FOR MOBI TOWERS
STEP 4:
Fit one end of a green coded
Diagonal Brace to the second
transom up from the base of one
frame. Fit the other end of the
brace to the second transom
down from the top of the
opposite frame. The brace should
be positioned immediately inside
the vertical frame members on
one side.
Repeat the process for a second diagonal brace on
the opposite side. The braces must be installed at
opposing angles to each other as shown.
If Tower is set up
over two levels high
then Outriggers must
be attached to the
Standards as shown.
Outrigger
Clamps
If Tower is set up
over two levels high
then Outriggers must
be attached to the
Standards as shown.
Outrigger
Clamps
Toeboard
Guardrail & Midrail
Angle Brace
Spring clip
Locked
Unlocked
Wingnut
Wingn
Ledgers
Plan Brace
Diagonal Brace
If Tower is set up
over two levels high
then Outriggers must
be attached to the
Standards as shown.
Outrigger
Clamps
If Tower is set up
over two levels high
then Outriggers must
be attached to the
Standards as shown.
Outrigger
Clamps
Toeboard
Guardrail & Midrail
Angle Brace
Spring clip
Locked
Unlocked
Wingnut
Wingn
Ledgers
Plan Brace
Diagonal Brace
If Tower is set up
over two levels high
then Outriggers must
be attached to the
Standards as shown.
Outrigger
Clamps
If Tower is set up
over two levels high
then Outriggers must
be attached to the
Standards as shown.
Outrigger
Clamps
Toeboard
Guardrail & Midrail
Angle Brace
Spring clip
Locked
Unlocked
Wingnut
Wingn
Ledgers
Plan Brace
Diagonal Brace
If Tower is set up
over two levels high
then Outriggers must
be attached to the
Standards as shown.
Outrigger
Clamps
If Tower is set up
over two levels high
then Outriggers must
be attached to the
Standards as shown.
Outrigger
Clamps
Toeboard
Guardrail & Midrail
Angle Brace
Spring clip
Locked
Unlocked
Wingnut
Wingn
Ledgers
Plan Brace
Diagonal Brace
If Tower is set up
over two levels high
then Outriggers must
be attached to the
Standards as shown.
Outrigger
Clamps
If Tower is set up
over two levels high
then Outriggers must
be attached to the
Standards as shown.
Outrigger
Clamps
Toeboard
Guardrail & Midrail
Angle Brace
Spring clip
Locked
Unlocked
Wingnut
Wingn
Ledgers
Plan Brace
Diagonal Brace