To order parts and supplies: 800.343.9353 >> eastwood.com
5
FIG. 6
FIG. 6
FIG. 7
FIG. 7
FIG. 8
FIG. 8
FIG. 9
FIG. 9
FIG. 10
FIG. 10
FIG. 11
FIG. 11
• Stand the Assembled Frame upright and carefully mount the Hydraulic Pump Unit
[N]
onto the outside face of the right Main Frame Side
[A]
with four M10 x 1.50 x
15 mm Bolts, Washers and Lock washers
(FIG 6)
.
• Unthread and remove the pre-installed Lock Collar from the Ram
[N]
and place it
aside for later re-installation
(FIG 7)
.
• Insert the Ram
[Q]
with the hose connection end facing upward, through the
center hole of the Yoke Plate
[P]
. Thread the previously removed Lock Collar onto
the threads of the Ram
[N] (FIG 8)
.
• Slip the Nylon Seal
[S]
over the threaded fitting of the Force Gauge
[R]
then
install it with the Gauge facing forward
(FIG 9)
.
• Remove the protective plastic cap from the female fitting on the side of the Ram
[N]
and thread the male, Hydraulic Pump hose fitting into it
(FIG 10)
.
• Remove the Outer Locknuts and one washer from the Foot Pedal Pivot Shaft
Ass’y
[V]
and set them aside.
• Remove the outer nut and washer from the Spring Eyelet Assembly
[W]
and set
them aside.
• Insert the longer threaded end of the Foot Pedal Pivot Shaft
[V]
(with the inner
nut and washer in place) into the corresponding hole in the face of the right Main
Frame Side
[A] (FIG 11)
.
• Using the previously removed Locknut and Washer, secure the Pivot Shaft tightly
in place
(FIG 11)
.