4
Eastwood Technical Assistance: 800.343.9353 >> [email protected]
ASSEMBLY
• Attach the Upper Frame Beams
[B]
to the Main Frame Sides
[A]
with 8 sets of
M12 x 1.75 x 30 mm Bolts, Nuts and Washers
(FIG 1)
.
• Join the Main Frame Sides
[A]
, the Base Rails
[C]
and the flanges of the Lower
Cross Member
[D]
together with four M10 x 1.50 x 35 mm Bolts, Nuts and Lock
Washers
(FIG 2)
.
NOTE:
Do Not tighten hardware until all pieces are assembled to allow for
alignment.
• Add the four Angle Braces
[E]
between the Main Frame Sides
[A]
and the
Base Rails
[C]
with M10 x 1.50 x 30 mm Bolts, Nuts, Washers and Lock
Washers
(FIG 3)
.
• Stand the Assembled Frame upright carefully mount the Hydraulic Pump Unit
[L]
onto the outside face of the right Main Frame Side
[A]
with four M10 x 1.50 x 16
mm Bolts, Washers and Lock washers
(FIG 4)
.
• Center and set the Upper Yoke Plate
[M]
on the top of the assembled Frame
Beams
[B]
with the Lower Yoke Plate
[N]
under the Frame Beams. Secure with
(2) M10 x 1.50 x 145 mm Shoulder Bolts, Washers and Nuts
(FIG 5)
.
NOTE:
Do Not overtighten bolts and distort the thinner Upper Yoke Plate.
• Unthread and remove the pre-installed Lock Collar from the Ram
[P]
and place
it aside for later re-installation
(FIG 6)
.