4
Eastwood Technical Assistance: 800.544.5118 >> techelp@eastwood.com
FIG. 3
FIG. 4
ASSEMBLY
• Begin by placing the Drain Work Top
[A]
upside down on a soft surface.
NOTE:
The cardboard carton provides an excellent scratch-resistant
work surface.
• Set the “U” section of a Side Frame
[B]
with the punched corner holes
aligned with the threaded holes in the ends of the Drain Work Top
[A]
.
Thread in two M8 x 40mm Bolts with four M8 Lock washers
and secure with a 14mm wrench
(FIG 1)
.
• Repeat for 2nd Side Frame
[B]
.
• Lie the Drain Top and Side Frames assembly
[A & B]
over on one side.
• Place eight M8 Flat Washers under the heads of the eight M8 x 40mm
Bolts.
• Drop in one of the two identical Shelf Trays
[C]
with the open side up,
then align the four punched holes in the corner notches with those in
the middle of the Side Frames
(FIG 2)
.
• With threads facing inward, insert four of the eight M8 x 40mm Bolts
with Washers into the open holes of the Side Frames and Shelf Tray
(FIG 3)
.
• In this sequence, place four more M8 Flat Washers over the threads
of M8 x 40mm Bolts, then thread on the M8 Nuts
(FIG 4)
. Tighten all
hardware with 14mm & 13 mm wrenches.
• Repeat with the remaining Shelf Tray and hardware
[C]
.
• Once again turn the assembly upside down for caster installation
(FIG 6)
.
The Eastwood Tear Down Table consists of cumbersome
metal components. Avoid pinching hands while han-
dling parts during assembly. Obtaining the assistance
of a helper during assembly is recommended.
FIG. 1
FIG. 2
A
✓
B
✓
A
B
C
✓
✓
✓