4
Eastwood Technical Assistance: 800.343.9353 >> [email protected]
ASSEMBLY
• Thread the 4 Handle Spokes into the machined Hub located on
the Upper Shaft end adjacent to the Upper Spur Gear
(Fig 1)
.
• Check the tightness of the 2 set-screws securing the Hub to
the Upper Shaft with a 4mm Hex Key (not included)
(Fig 2)
.
FIG. 1
FIG. 2
SET UP
• Clamp the lower edge of the Bead Roller Frame in a minimum 4”
(6” & larger strongly recommended) vise (not included) with the
Roller Tensioning Screw toward the top and the Lock Screw to the
rear
(FIG 3)
and tighten vice securely.
NOTE:
It is helpful to use
a vise with a swiveling base, since you will be able to rotate it as
needed to maintain a comfortable position while working a panel.
FIG. 3
Lock Screw
✓