Preventive Maintenance Schedule
5B6746 – November 1995
11
Section 4: Preventive Maintenance Schedule
Part or Assembly
Weekly*
Monthly†Ä††
†Ä†ë†
3 Month Schedule‡
DETECTOR CROSSOVER
C
DEVELOPER/FIXER CROSSOVER
C
FIXER/WASH CROSSOVER
C
WASH RACK
C
C(2)
DEVELOPER RACK
I,C
C(1)
FIXER RACK
I,C
C(2)
DRYER RACK
I,C
TOP EXIT RACK
I,C
RACK BEARINGS, CHAINS, and DRIVE GEARS
I
Squareness of RACKS
I
DRYER AIR TUBES
I,C
DEVELOPER FILTER
R
REPLENISHMENT STRAINERS and FILTERS
C
Water Supply FILTER
R
DRAIN HOSES
I,R
Ventilation Exhaust
T
DRIVE MOTOR CHAIN
I,L
LEVEL SENSOR PROBES
C
SPRING SPADES on the LEVEL SENSOR PROBES
C(3)
DEVELOPER PROCESSOR TANK
C(1)
FIXER and WASH PROCESSOR TANKS
C(2)
Calibration of the REPLENISHMENT PUMPS
T
DETECTOR SWITCHES
T
6000 CIRCUIT BOARD HOUSING
C(4)
WATER RESERVOIR
C
I
= Inspect for condition and adjust or install
new parts, if necessary.
L
= Lubricate with recommended material.
R
= Replace, if necessary.
T
= Test and adjust, if necessary.
* The weekly preventive maintenance
procedures can be performed by either the
operator of the PROCESSOR or by the trained
service provider.
† Completion of the monthly preventive
maintenance procedures is recommended to
ensure the optimum reliability of the
PROCESSOR.
C
= Rinse and clean carefully and completely
using warm water and a soft synthetic
sponge.
C(1) = Clean with
Kodak DEVELOPER SYSTEM
CLEANER AND NEUTRALIZER.
C(2) = Clean with
Kodak FIXER/WASH SYSTEM
CLEANER.
C(3) = Clean any corrosion from the SPRING
SPADES.
C(4) = Clean with a damp, synthetic sponge.
‡ The 3 month schedule is a guideline for sites
adhering to the site specifications issued by
Kodak. Actual usage and site characteristics may
require shorter intervals between maintenance.