background image

Maintenance   27 

Using the tensioning bolts, restore tension on the idler pulley. 

 

 

 

Retighten the socket head cap screws in the bottom of the conveyor to secure the idler 

pulley brackets in place. 

 

Plug in and turn on the BB-2/3T Case Taper to resume taping. 

 

 

 

 

 

Drive Pulley 

Idler Pulley 

Idler Pulley 

Restore 

Tension 

Re-tighten 

Summary of Contents for BB-2T

Page 1: ...BB 2 3T Bottom Belt Case Taping System User Guide...

Page 2: ......

Page 3: ...Copyright and Trademarks Copyright 2015 2019 Engage Technologies Corporation All rights reserved All trademarks and brand names are the property of their respective owners Eastey 7041 Boone Ave N Bro...

Page 4: ......

Page 5: ...5 Check Tension 16 Thread Tape 16 Main Spring 18 Control Panel 19 Adjustments 20 Box Width and Height Adjustment 20 Guide Rail Adjustment 21 Top Tape Head Height Adjustment 22 Belt Adjustment 23 Maint...

Page 6: ......

Page 7: ...erlocks switches etc Do not operate the machine if such modifications have been made Do not attempt to operate the machine with loads that exceed the limits of use and operation in regards to weight a...

Page 8: ...2 3T Case Taper Overview Height Adjustment Crank Tape Sealer Heads Top and Bottom Mast Machine Body Adjustable Leg Control Panel Locking Casters Standard Pack Table Standard Front and Rear Adjustable...

Page 9: ...54 1 to 69 1 cm without casters 25 8 to 31 7 inches 65 5 to 80 5 cm with casters Electrical Requirements 110 VAC 60 Hz 6A Power Consumption 200 W Air Requirements None Machine Size L 64 inches 162 cm...

Page 10: ...10 Introduction Dimensions Dimensions shown are in inches...

Page 11: ...fting the case taper and ensure the case taper is secure and will not shift while being moved or during height adjustment and caster installation Install Casters Four locking casters are provided stan...

Page 12: ...is positioned in the operating location you will need access to 1 Control panel switches Emergency Stop Start and Stop 2 Height and width adjustments 3 Tape loading Both upper and lower tape cartridg...

Page 13: ...d rear of the conveyor body Load the tape heads with tape One roll each follow instructions provided in the Tape Cartridge User Guide Optional Mounting For Top Squeezers Threaded holes are provided on...

Page 14: ...the tape cartridges in the upper and lower tape heads Refer to the Adjustments section for instructions to make necessary height and width adjustments that must be made for operation of the box taper...

Page 15: ...e tape cutting blade The taping cartridge in the upper head assembly is secured in place by a single wing bolt winged head cap screw Temporarily remove the wing bolt to remove the upper tape head Afte...

Page 16: ...hrough the rollers in the tape head as shown in the applicable diagram in the Tape Head User Guide provided with the tape head For convenience diagrams for threading tape in the Eastey EX Tape Head an...

Page 17: ...Operation 17 Eastey EX Tape Head EZ EX Tape Head Adhesive Side Adhesive Side Adhesive Side Upper Cartridge Bottom Cartridge Adhesive Side Upper Cartridge Bottom Cartridge...

Page 18: ...the operation position Main Spring For sealing light weight boxes decrease the main spring tension For heavier boxes increase the main spring tension When setting tension for the rollers consider the...

Page 19: ...start motors and belts Start and stop buttons are covered by a clear plastic to protect them from dust dirt etc To reset the Emergency Stop button once the emergency condition has been cleared and it...

Page 20: ...the box centered with the conveyor drive belt and tape heads Use the filled box to adjust the width of guide rails and top tape head height to accommodate the box width and height as explained in the...

Page 21: ...h keeps the tape seal on center as it is applied to the box on the top or bottom seams To adjust the guide rail width loosen the hand knob below the in feed table on the leg on the side opposite the m...

Page 22: ...e crank clockwise to lower the tape head Top Squeezer Adjustment When equipped with optional top squeezers If optional top squeezers are installed adjust top squeezers to the box width moving each box...

Page 23: ...x socket tensioning screws B in the end When belt is set to the required tension re tighten the hex socket cap screws A Tape Head Adjustment Refer to Tape Head User Guide Refer to instructions in the...

Page 24: ...when cleaning the rollers Cutting Knives Occasionally inspect the cutting knives to ensure they are clean and free of adhesive residue Make sure the cutting knife is sharp by inspecting cuts in the ta...

Page 25: ...s Turn off and unplug the taper Loosen the tension on the belt completely With the belt loose remove the connecting pin that holds the belt together Connecting Pin Drive Belt Drive Pulley Drive Belt I...

Page 26: ...Take the belt off the machine Install the new belt around the drive and idler pulleys While the belt is still loose connect the ends by lining up the loops and replacing the connecting pin Connecting...

Page 27: ...on the idler pulley Retighten the socket head cap screws in the bottom of the conveyor to secure the idler pulley brackets in place Plug in and turn on the BB 2 3T Case Taper to resume taping Drive Pu...

Page 28: ...Leg on Front Tape tension is too low Tighten the one way clutch roller and or the tape core Adjust the one way clutch roller in the slot so it is slightly beyond the front wipe roller Adjust the tape...

Page 29: ...to be sure tape is threaded properly on front roller page 17 Check wipe down brush Tape Curling and Bunching Up Eastey EX Tape Head Only Eastey EX Tape Head Only Adjust the tape cartridge height appro...

Page 30: ...30 Illustrated Parts List Parts List Electrical 2 1 1a...

Page 31: ...264 BBT V0 ELECTRICAL BOX 230 V ELECTRICAL BOX 110 V P0323 0000600 P0323 0000700 1 1a 1F8 5005197 FUSE P0305 030002600 1 2 1M8 5001714 TB 5001714 BB V1 MOTOR 110V 60Hz T18 1 MOTOR 110V 50Hz T15 1 MOTO...

Page 32: ...32 Illustrated Parts List Machine Body and Tables 39 38 1 2 3 4 5 6 7 8 9 10 13 28 45 46 30 31 33 35 36 37 34 32 29 27 12 43 11 14 15 18 20 24 22 21 23 26 41 42 40 44 47 25 19 16 17...

Page 33: ...00 5001993 2 14 5004144 RING KA30016100 4 15 5004145 GUIDE RAIL SQUEEZER ARM SHAFT P02 016200A 2 16 5001922 CHAIN WHEEL KA31005800 1 17 5001939 SHAFT KA03066400 1 18 5001867 BEARING SEAT CA131000 2 19...

Page 34: ...07900 2 38 5002107 ADJUSTABLE LEG KA11107700 4 39 5001902 CASTER SWIVEL LOCKING KA04010800 4 40 5004157 CONTROL BOX FIX PLATE KA11113600 1 41 5002117 PACKING PLATE KA30016600 2 42 5004158 PACKING TABL...

Page 35: ...Illustrated Parts List 35 Mast and Upper Tape Head Seat 25 8 7 17 12 14 13 3 4 26 5 11 10 6 9 2 1 22 21 20 19 18 16 15 23 24 27...

Page 36: ...EIGHT ADJUSTABLE SPINDLE KA03072800 1 13 5004087 NUT LEADSCREW CA1 1061 01 1 14 5004088 WASHER KA11129700 1 15 5004089 SPRING KA04014500 1 16 5004090 SPINDLE SEAT KA03072900 1 17 5004170 COVER PLATE K...

Page 37: ...Appendix A Electrical Schematic 37 Appendix A Electrical Schematic...

Page 38: ...cation will be the same as that achieved on a test piece in our demo facility Shipping Policy Customer pays all incoming shipping If the item is defective and under warranty Eastey pays return shippin...

Page 39: ...ULAR PURPOSE AND NONINFRINGEMENT Disclaimer of Damages REGARDLESS OF WHETHER ANY REMEDY SET FORTH HEREIN FAILS OF ITS ESSENTIAL PURPOSE IN NO EVENT WILL EASTEY BE LIABLE FOR ANY SPECIAL CONSEQUENTIAL...

Page 40: ...2 3T Case Taper please contact Eastey Technical Service at one of the numbers listed below Toll Free Phone 800 835 9344 Phone 763 428 4846 Fax 763 795 8867 E mail info eastey com Web www eastey com T...

Page 41: ......

Page 42: ......

Reviews: