![Eastern Jungle Gym 3-Chain Tire Swing Assembly Instructions Download Page 2](http://html1.mh-extra.com/html/eastern-jungle-gym/3-chain-tire-swing/3-chain-tire-swing_assembly-instructions_3457227002.webp)
STOP!
Now you are ready to begin assembly!
R
The Rubber Tire Swing is
pre-drilled on both sides.
The top
side has 3 small holes for the connection of the swing chains and
the bottom side has 4 or more large holes for the drainage
of water.
Please inspect your tire before connecting the eye
hooks to ensure that they are installed on the correct side.
Top Side (CORRECT)
3 pre-drilled holes that are small in size and evenly spaced
Bottom Side (INCORRECT)
4 or more pre-drilled holes that are large in size and scattered
PLEASE READ BEFORE BEGINNING
ASSEMBLY:
“Creating Childhood Memories”