Commissioning
4.
3.2
Step 1
Step 2
Step 3
Unscrew the swivel nut from
the threaded sleeve,
then thread the swivel nut and
threaded sleeve over
the AC cable
Insert the conductor into a suitable ferrule
acc. to DIN 46228-4 and crimp.
Insert the crimped conductors, L, N and PE
into corresponding terminals and tighten
the screws (torque 0.6±0.1N·m).
Assemble the locking cap,
threaded sleeve and swivel
nut together.
Screw the AC connector and
tighten firmly into socket.
Approx. 60mm
For “L1” , “L2”,“L3”and “N”
10 mm
Approx. 63mm
1
2
3.5
RS485/Smart Meter/DRED Connection
2
1
COM2:METER/DRED
COM1:RS485
Step 1
Position
Power + PIN 1
Power - PIN2
RS485 A PIN3
RS485 B PIN4
1
2
3
4
2
1
4
Insert the crimped conductors accordingly into their corresponding terminals and tighten the screws use the screwdriver in the attached bag.
METER OR DRED FOR COM2
RS485 A PIN2
RS485 B PIN3
COM LOAD/0 PIN1
REF GEN/0
PIN4
R 485 FOR COM1
S
3.3
DC Wire Assembly and Connection
Step 1
Step 2
Step 3
Step 4
Step 5
Step 6
7mm
Assemble the cable ends
7mm
click
click
φ
5-8mm
PV1-F/UL-ZKLA/USE2
PV1-F/UL-ZKLA/USE2
2.5-6 mm²
Note: According to AS/NZS 5033, PV arrays for installation on domestic
dwellings shall not have PV array maximum voltages greater than 600V.
1
)
Wi-Fi/GPRS Connection
(Optional)
3.4
The stick is included in the scope of delivery as an option.
3.4.1 Tighten the stick into the COM1 port. Make sure the stick is
securely connected.
3.4.2 For the connection and configuration of the stick please refer to
<Wi-Fi stick User manual> or <GPRS stick User manual>.
Assemble the connectors
2.6-2.9 N·m
Positive
Negative
L3
L2
L1
N
PE
www.
easelectric.es
EAS ELECTRIC SMART TECHNOLOGY, S.L.
Address:
P.I. Codonyers, C/Principal, 4 46220 Picassent (Valencia, SPAIN)
Positive terminal
Negative terminal