![EarthWay SIDESPREAD CONTROL 2150 Assembly Instructions Manual Download Page 2](http://html2.mh-extra.com/html/earthway/sidespread-control-2150/sidespread-control-2150_assembly-instructions-manual_4846052002.webp)
50 lb Commercial Spreader
with Side Spread Control
MODEL # 2150
ASSEMBLY INSTRUCTIONS
2150_MARCH2024
PAGE 2
HELPFUL HINTS
Read the directions before assembly.
If your spreader does not spread evenly, be sure “FRONT” on the GEARBOX points to the front of the spreader.
The
impeller must turn clockwise when pushing forward
. Reversing the GEARBOX will cause the impeller to turn counter
clockwise. Clean the impeller plate after each use. Fertilizer stuck on the impeller blades will cause uneven spreading.
Your spreader is designed to be pushed at three miles per hour, which is a brisk walking speed. Slower or faster
speeds will change the spread patterns. Wet fertilizer will also change the spread pattern and flow rate.
Clean
and dry
your spreader thoroughly after each use. Coat all metal surfaces
(inside & outside of tubing)
with light
oil, Fluid Film® or silicon spray to help prevent corrosion. Wash between the shut off plate and bottom of the
hopper.
Do not use powdered materials as it will damage the gearbox.
Gears are permanently lubricated at the factory. Do not open the GEARBOX or dirt may enter.
ASSEMBLY INSTRUCTIONS
Step 1:
Remove all components and hardware items
from the box. Place the spreader HOPPER upside down
and face the front (logo) away from yourself.
Step 2:
Install FRAME using (4) 1 ½” (40mm) Phillips
screws.
TIGHTEN THESE NOW
Step 3:
Insert IMPELLER onto PINION SHAFT by
pressing the impeller down onto the coined portion of the
shaft (see image to the right).
Next
, insert CROSS BRACE into the GEARBOX GRACE as
shown to the right.
4 qty Philips Screws