background image

32103 

Qty 9

32100 

Qty 2

36300 

Qty 6

12152 

Qty 2

12148 

Qty 2

33109 

Qty 1

36214 

Qty 4

33108 

Qty 1

36210 

Qty 2

31100 

Qty 4

31106 

Qty 2

31120

Qty 5

1. 

 Remove and identify all loose parts from carton

.

44249

13

16

17

31

24

28

23

25

26

9

11

12

40

29

(Qty 4 #36214)

1/4-20 X 1½”

Phillips Panhead

(Qty 4 #36300)

1/4-20 SS Locknut

2.

 Position hopper on side.  Install frame using (4) 1/4-20 x 1-1/2” 

Pan Head Phillips bolts and (4) 1/4-20 nylon insert locknuts.  First put 

bolts through holes in frame then through holes in bottom of hopper. 

Secure with locknuts.  

TIGHTEN THESE LOCKNUTS NOW - DO NOT 

TIGHTEN WITH POWER TOOLS.  TIP: coat stainless steel bolts 

with wax or grease before tightening to prevent them from seizing.

       

   

PAGE 1

90399 STAINLESS

 

HELPFUL HINTS:

 

READ THE DIRECTIONS BEFORE ASSEMBLY

 If  your spreader does not spread evenly, be sure the FRONT on the gear box points to the front of the spreader. 

The impeller must turn clockwise.  Reversing  the gearbox will cause the impeller to turn counter clockwise. 

Clean the impeller plate after each use. Ice melt stuck on the impeller blades will cause uneven spreading.

 Your  spreader is designed to be pushed at three miles per hour, which is a brisk walking speed.  Slower or 

Clean and dry your spreader thoroughly after each use.  Coat all metal surfaces (

pay special attention to the 

inside & outside of tubing - it’s easiest to do while assembling

) with light oil, Fluid Film

®

 or silicon spray 

Do not use powdered 

materials.

 Gears are permanently lubricated at the factory.  Do not open the gearbox or dirt may enter.

PLEASE CONTACT US 

 IF YOU ARE MISSING ANY PARTS OR HAVE QUESTIONS REGARDING THE OPERATION OF 

THIS SPREADER, VISIT THE EARTHWAY WEBSITE OR CONTACT SUPPORT AT: 

.  

 PHONE: 574-848-7491  EMAIL: [email protected]

 

IF YOUR SPREADER COMES SEMI ASSEMBLED, SKIP TO STEP #7

ICE MELT SPREADER

ASSEMBLY & OPERATION 

OCT 2019 REV

Summary of Contents for PolarTech 90399

Page 1: ...the FRONT on the gear box points to the front of the spreader The impeller must turn clockwise Reversing the gearbox will cause the impeller to turn counter clockwise Clean the impeller plate after each use Ice melt stuck on the impeller blades will cause uneven spreading Your spreader is designed to be pushed at three miles per hour which is a brisk walking speed Slower or Clean and dry your spre...

Page 2: ...box must point to Front of the hopper The EarthWay logo is on the front of the hopper Axle Bearing Flat Side Notch NOW GO BACK AND TIGHTEN ALL NUTS AND BOLTS STARTING WITH FIRST STEP DO NOT OVER TIGHTEN PAGE 2 5 A Install lower handles onto the frame to both sides as shown Insert 2 bolt through second hole in lower handle locknut DO NOT TIGHTEN B hole in lower handle Then through frame brace NOTE ...

Page 3: ...to prevent pin from falling out Coast wheel side 1 Cotter Pin Drive wheel side 2 Cotter Pin TURN SPREADER UPRIGHT ON TO WHEELS 1 4 20 x 2 Hex Head Bolt Gauge Lever Assembly Upper Handles 1 4 20 Locknuts Handle Shaft Long end Shut Off Plate Pivot Rod with extra bend Rotate Pivot PAGE 3 Insert Pivot Rod into Shut Off and rotate to secure Angle Attaching Arm Pivot Rod 10 Insert 2 bolt through Gauge L...

Page 4: ...ING 30 ON THE FLOW CONTROL LEVER MUST PLACE THE SHUT OFF PLATE IN THE FULL OPEN POSITION TO BE PROPERLY CALIBRATED Now tighten the nuts against the pivot bracket to prevent change in calibration 17 20 Hex Nuts Pivot Bracket Control Rod Pivot Rod PAGE 4 13 Install handle shaft to lower handles and pivot bracket assembly as shown Using 1 4 20 x 2 bolts and locknuts TIGHTEN BOLTS AND NUTS NOW 1 4 20 ...

Page 5: ...te to Earthway Products 1009 Maple St Bristol Indiana 46507 and describe the nature of the manufacturing defect SPECIFIC LIMITATIONS This warranty covers only the part s or product any labor charges thoroughly after each use as a preventative measure coat all metal parts with a light oil or silicon spray OPERATING INSTRUCTIONS Move stop bolt on rate gauge assembly to the proper setting While pushi...

Page 6: ...SS UPPER HANDLE SQUARE W GRIP ea 34 33103 3 16 X 2 COTTER PIN STAINLESS 14 24500 AXLE COINED 35 70138 PNEUMATIC DRIVE WHEEL STUD 15 36200 1 4 20 X 1 1 2 HHMS STAINLESS 36 33104 3 16 X 1 COTTER PIN STAINLESS 16 25223 SS HANDLE SHAFT SQ STAINLESS 37 11927 SHUTOFF SUPPORT LARGE 17 42256 CONTROL ROD 38 60027 WING NUT ASSEMBLY BLACK 18 31138 8 X 3 8 PMT 8 HD COARSE BLACK 39 37100 1 4 20 X 1 CARRIAGE BO...

Reviews: